Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | Space One | ISRO | RKTs Progress |
| Country | 🇯🇵 Japan | 🇮🇳 India | 🇷🇺 Russia |
| Status | In Development | Active | Active |
| Vehicle class | Small | Heavy | Medium |
| Propellant | Solid | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | RP-1 / LOX |
| Reusable | No | No | No |
| Stages | 4 | 3 | 3 |
| First flight | 2024 | 2017 | 2026 |
| Payload to LEO | — | 10,000 kgas of [1] | 18,000 kgas of [1]Uncrewed configuration. ↑ Best |
| Payload to GTO | — | 4,000 kgas of [1] ↑ Best | — |
| Height | — | 43.43 mas of [1] | 61.9 m (uncrewed) / 65.9 m (crewed variant)as of [1] ↑ Best |
| Liftoff mass | — | 643 tas of [1] ↑ Best | 530 tas of [1] |
| Success rate | 0/3 — three consecutive failuresas of [1]2024-03-13: disintegrated shortly after liftoff. 2024-12-18: began tumbling during 1st-stage burn, flight terminated. 2026-03-04: flight termination activated ~70 seconds after liftoff. All three launches flew from Spaceport Kii, Wakayama — Japan's first private-sector spaceport. Program grounded as of this research; precise payload/height/mass specs not confirmed from a primary source. | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | — |
| Total flights | 3as of [1] | 10as of [2] ↑ Best | 1 (suborbital test)as of [1]First flight 2026-04-30 was a suborbital test, not yet a full orbital mission per this source. |
| Cost / kg LEO | — | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest | — |
| Summary | A Japanese commercial solid-fuel small launcher that has failed on all three flight attempts through March 2026, putting its commercial viability in serious question. | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | Russia's replacement for the Ukrainian-built Zenit, restoring medium-lift capability lost after 2014. Uses the RD-171MV — described as the most powerful liquid-fuel rocket engine in the world — on its first stage, launching from Baikonur. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.