Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Electron 🇳🇿 New Zealand / USA Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-28Remove × | ||
|---|---|---|---|
| Company | Space One | Isar Aerospace | Rocket Lab |
| Country | 🇯🇵 Japan | 🇩🇪 Germany | 🇳🇿 New Zealand / USA |
| Status | In Development | In Development | Active |
| Vehicle class | Small | Small | Small |
| Propellant | Solid | LOX / kerosene (~80% manufactured in-house) | RP-1 / LOX |
| Reusable | No | No | Yes |
| Stages | 4 | 2 | 2 |
| First flight | 2024 | 2025 | 2017 |
| Payload to LEO | — | 1,000 kgas of [1] ↑ Best | 300 kgas of [1]~200 kg reusable mode (lower due to propellant reserved for re-entry burn) |
| Payload to GTO | — | — | — |
| Height | — | — | 18 mas of [1] ↑ Best |
| Liftoff mass | — | — | 13 tas of [1] ↑ Best |
| Success rate | 0/3 — three consecutive failuresas of [1]2024-03-13: disintegrated shortly after liftoff. 2024-12-18: began tumbling during 1st-stage burn, flight terminated. 2026-03-04: flight termination activated ~70 seconds after liftoff. All three launches flew from Spaceport Kii, Wakayama — Japan's first private-sector spaceport. Program grounded as of this research; precise payload/height/mass specs not confirmed from a primary source. | 0/1 (first flight failed)as of [1]First flight from Andøya Spaceport (2025-03-30): liftoff succeeded but the rocket was terminated ~30 seconds in after a vent valve opened unexpectedly, causing loss of attitude control. Second flight ('Onward and Upward') repeatedly delayed through 2026 (weather, a safety-zone fishing vessel, a composite pressure vessel leak, then off-nominal fluid-system behavior as of 2026-06-15) — not yet flown as of this research. | 95.6%as of [3]87 successes / 91 Electron-family flights. Orbital Electron alone: 78/82 (95.1%). HASTE: 9/9. On a 50-flight success streak since December 2023; 21/21 in the 2025 calendar year. ↑ Best |
| Total flights | 3as of [1] | 1as of [1] | 91as of [3]91 Electron-family flights: 82 orbital plus 9 suborbital HASTE. Reconciled against three 10-K cumulative checkpoints (38/54/75 successes through 2023/2024/2025). Rocket Lab counts HASTE inside its own 'Electron launched N times' figure. ↑ Best |
| Cost / kg LEO | — | — | ~$25,000/kgas of [1]Based on ~$7.5M list price / 300 kg payload ↓ Cheapest |
| Summary | A Japanese commercial solid-fuel small launcher that has failed on all three flight attempts through March 2026, putting its commercial viability in serious question. | Germany's first orbital-class launcher attempt; its first flight in March 2025 was Western Europe's first orbital launch attempt from the European mainland. A qualification second flight carrying CubeSats and ESA experiments has slipped repeatedly through 2026. | The world's most commercially active small launch vehicle, designed and built in-house at Rocket Lab. Rutherford engines are the first flight-proven engines made with additive manufacturing (metal 3D printing). Booster recovery via parachute and helicopter catch (later transitioned to ocean recovery). |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.