Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Space One | LandSpace | Gilmour Space Technologies |
| Country | 🇯🇵 Japan | 🇨🇳 China | 🇦🇺 Australia |
| Status | In Development | Active | In Development |
| Vehicle class | Small | Medium | Small |
| Propellant | Solid | CH₄ / LOX (9× TQ-12B first stage; TQ-15B vacuum upper stage) | Hybrid (Sirius motors, stages 1–2) / liquid (Phoenix engine, stage 3) |
| Reusable | No | Yes | No |
| Stages | 4 | 2 | 3 |
| First flight | 2024 | 2025 | 2025 |
| Payload to LEO | — | 21,000 kgas of [1]Expendable; ~18,300 kg with first-stage recovery ↑ Best | 300 kgas of [1] |
| Payload to GTO | — | — | — |
| Height | — | 76.2 mas of [1] ↑ Best | 25 mas of [1] |
| Liftoff mass | — | ~660 tas of [1] ↑ Best | — |
| Success rate | 0/3 — three consecutive failuresas of [1]2024-03-13: disintegrated shortly after liftoff. 2024-12-18: began tumbling during 1st-stage burn, flight terminated. 2026-03-04: flight termination activated ~70 seconds after liftoff. All three launches flew from Spaceport Kii, Wakayama — Japan's first private-sector spaceport. Program grounded as of this research; precise payload/height/mass specs not confirmed from a primary source. | 100%as of [2]1/1 orbital successes (Y1, Dec 3, 2025). First-stage recovery failed — abnormal combustion during the landing burn crashed the booster near the landing zone. ↑ Best | 0/1as of [1]Maiden flight 2025-07-30 crashed 14 seconds after launch (insufficient thrust), from Bowen Orbital Spaceport, Queensland — Australia's first domestic orbital launch attempt. Preceded by two scrubs (2025-05-15 electrical issue, 2025-05-16 fairing anomaly). A second test flight was slated for early 2026. Block 2 (1,000 kg payload) and Eris Heavy (4,000 kg payload) variants are planned. |
| Total flights | 3as of [1] ↑ Best | 1as of [3]Second orbital launch and recovery attempt targeted Q2 2026 per LandSpace | 1as of [1] |
| Cost / kg LEO | — | — | — |
| Summary | A Japanese commercial solid-fuel small launcher that has failed on all three flight attempts through March 2026, putting its commercial viability in serious question. | LandSpace's stainless-steel, reusable methalox rocket — China's closest analogue to Falcon 9. The Y1 debut (Dec 3, 2025) reached orbit on the first attempt but lost the booster during its landing attempt; a second flight with another recovery attempt is targeted for Q2 2026. | Australia's first domestically developed orbital launch vehicle attempt, using a hybrid-propellant first and second stage; the maiden flight failed 14 seconds after liftoff in July 2025. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.