Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | ExPace (CASIC subsidiary) | Firefly Aerospace | Rocket Lab |
| Country | 🇨🇳 China | 🇺🇸 USA | 🇺🇸 USA |
| Status | Active | Active | In Development |
| Vehicle class | Small | Small | Medium |
| Propellant | Solid (3 stages) + liquid upper stage | RP-1 / LOX | CH₄ / LOX |
| Reusable | No | No | Yes |
| Stages | 4 | 2 | 2 |
| First flight | 2020 | 2021 | 2026 |
| Payload to LEO | 1,500 kgas of [1] | 1,030 kgas of [1]SSO capacity ~630 kg | 13,000 kgas of [1]Reusable configuration with downrange barge landing — this is the single payload figure Rocket Lab publishes. ~15,000 kg expendable. ↑ Best |
| Payload to GTO | — | — | — |
| Height | — | 29 mas of [1] | 43 mas of [1] ↑ Best |
| Liftoff mass | 78 tas of [1]Transporter-erector-launcher (TEL) capable. | 54 tas of [1] | ~481 tas of [1] ↑ Best |
| Success rate | 80% (4/5)as of [1]Debut flight (2020-07-10) failed; returned to flight 2022-12-07 successfully. ↑ Best | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 | — |
| Total flights | 5as of [1] | 7as of [2] ↑ Best | — |
| Cost / kg LEO | — | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO ↓ Cheapest | — |
| Summary | The larger sibling of Kuaizhou-1A, roughly 3.75x the payload class, road-mobile and solid-fueled, recovering commercial cadence after a 2020 debut failure. | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. | Rocket Lab's medium-lift reusable rocket targeting the $100B constellation replenishment market. Uses a 'hungry hippo' fairings design that opens at the top rather than traditional clamshell separation. First flight delayed to Q4 2026 after a Jan 2026 propellant tank test anomaly. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.