Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | ExPace (CASIC subsidiary) | Isar Aerospace | Firefly Aerospace |
| Country | 🇨🇳 China | 🇩🇪 Germany | 🇺🇸 USA |
| Status | Active | In Development | Active |
| Vehicle class | Small | Small | Small |
| Propellant | Solid (3 stages) + liquid upper stage | LOX / kerosene (~80% manufactured in-house) | RP-1 / LOX |
| Reusable | No | No | No |
| Stages | 4 | 2 | 2 |
| First flight | 2020 | 2025 | 2021 |
| Payload to LEO | 1,500 kgas of [1] ↑ Best | 1,000 kgas of [1] | 1,030 kgas of [1]SSO capacity ~630 kg |
| Payload to GTO | — | — | — |
| Height | — | — | 29 mas of [1] ↑ Best |
| Liftoff mass | 78 tas of [1]Transporter-erector-launcher (TEL) capable. ↑ Best | — | 54 tas of [1] |
| Success rate | 80% (4/5)as of [1]Debut flight (2020-07-10) failed; returned to flight 2022-12-07 successfully. ↑ Best | 0/1 (first flight failed)as of [1]First flight from Andøya Spaceport (2025-03-30): liftoff succeeded but the rocket was terminated ~30 seconds in after a vent valve opened unexpectedly, causing loss of attitude control. Second flight ('Onward and Upward') repeatedly delayed through 2026 (weather, a safety-zone fishing vessel, a composite pressure vessel leak, then off-nominal fluid-system behavior as of 2026-06-15) — not yet flown as of this research. | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 |
| Total flights | 5as of [1] | 1as of [1] | 7as of [2] ↑ Best |
| Cost / kg LEO | — | — | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO ↓ Cheapest |
| Summary | The larger sibling of Kuaizhou-1A, roughly 3.75x the payload class, road-mobile and solid-fueled, recovering commercial cadence after a 2020 debut failure. | Germany's first orbital-class launcher attempt; its first flight in March 2025 was Western Europe's first orbital launch attempt from the European mainland. A qualification second flight carrying CubeSats and ESA experiments has slipped repeatedly through 2026. | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.