Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | ExPace (CASIC subsidiary) | Rocket Lab | Isar Aerospace |
| Country | 🇨🇳 China | 🇺🇸 USA | 🇩🇪 Germany |
| Status | Active | In Development | In Development |
| Vehicle class | Small | Medium | Small |
| Propellant | Solid (3 stages) + liquid-fueled 4th stage | CH₄ / LOX | LOX / kerosene (~80% manufactured in-house) |
| Reusable | No | Yes | No |
| Stages | 4 | 2 | 2 |
| First flight | 2017 | 2026 | 2025 |
| Payload to LEO | 400 kgas of [1] | 13,000 kgas of [1]Reusable configuration with downrange barge landing — this is the single payload figure Rocket Lab publishes. ~15,000 kg expendable. ↑ Best | 1,000 kgas of [1] |
| Payload to GTO | — | — | — |
| Height | 19.4 mas of [1] | 43 mas of [1] ↑ Best | — |
| Liftoff mass | 30 tas of [1]Transporter-erector-launcher (TEL) capable — road-mobile solid launcher. | ~481 tas of [1] ↑ Best | — |
| Success rate | ~85% (23 successes, 3 failures, 1 partial failure of 27)as of [1] ↑ Best | — | 0/1 (first flight failed)as of [1]First flight from Andøya Spaceport (2025-03-30): liftoff succeeded but the rocket was terminated ~30 seconds in after a vent valve opened unexpectedly, causing loss of attitude control. Second flight ('Onward and Upward') repeatedly delayed through 2026 (weather, a safety-zone fishing vessel, a composite pressure vessel leak, then off-nominal fluid-system behavior as of 2026-06-15) — not yet flown as of this research. |
| Total flights | 27as of [1] ↑ Best | — | 1as of [1] |
| Cost / kg LEO | — | — | — |
| Summary | CASIC's road-mobile, quick-response small solid launcher, operated commercially by ExPace since 2017 — one of the higher-cadence Chinese small-lift vehicles. | Rocket Lab's medium-lift reusable rocket targeting the $100B constellation replenishment market. Uses a 'hungry hippo' fairings design that opens at the top rather than traditional clamshell separation. First flight delayed to Q4 2026 after a Jan 2026 propellant tank test anomaly. | Germany's first orbital-class launcher attempt; its first flight in March 2025 was Western Europe's first orbital launch attempt from the European mainland. A qualification second flight carrying CubeSats and ESA experiments has slipped repeatedly through 2026. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.