Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | ExPace (CASIC subsidiary) | ULA | SpaceX |
| Country | 🇨🇳 China | 🇺🇸 USA | 🇺🇸 USA |
| Status | Active | Active | In Development |
| Vehicle class | Small | Heavy | Super Heavy |
| Propellant | Solid (3 stages) + liquid-fueled 4th stage | LNG / LOX (BE-4); LH₂ / LOX (Centaur V) | CH₄ / LOX |
| Reusable | No | No | Yes |
| Stages | 4 | 2 | 2 |
| First flight | 2017 | 2024 | 2023 |
| Payload to LEO | 400 kgas of [1] | 27,200 kgas of [1]VC2S configuration (2 solid strap-on boosters) | ~150,000 kgas of [1]SpaceX projected max payload in fully expendable mode; ~100,000 kg reusable ↑ Best |
| Payload to GTO | — | 14,400 kgas of [1] | ~21,000 kgas of [1]Reusable configuration estimate ↑ Best |
| Height | 19.4 mas of [1] | 61.6 mas of [1] | 121 mas of [1]Version 2 (V2) full stack Ship + Super Heavy ↑ Best |
| Liftoff mass | 30 tas of [1]Transporter-erector-launcher (TEL) capable — road-mobile solid launcher. | 591 tas of [1]VC2S configuration | ~5,000 tas of [1] ↑ Best |
| Success rate | ~85% (23 successes, 3 failures, 1 partial failure of 27)as of [1] ↑ Best | 100%as of [2]4/4 payloads delivered: Cert-1 (Jan 2024), Cert-2 (Oct 2024, SRB nozzle anomaly), USSF-106 (Aug 13, 2025 — flight 3, first NSSL mission), USSF-87 (Feb 12, 2026 — flight 4, second SRB nozzle anomaly; Space Force paused Vulcan launches, RTF ~late 2026) | ~50%as of [2]Flights 1-12; ~6 complete mission successes (incl. Flights 10 and 11), remainder partial or vehicle lost. First payload deploy on Flight 10 (Aug 2025); Flight 12 (V3 debut) lost during descent. |
| Total flights | 27as of [1] ↑ Best | 4as of [2] | 12as of [2]Flight 1 (Apr 2023) through Flight 12 (May 22, 2026 — V3 debut from Pad 2). Flight 11 (Oct 13, 2025) closed out Block 2. |
| Cost / kg LEO | — | ~$5,500/kgas of [1]Estimated; list pricing not public. Priced below Atlas V, above Ariane 6. | ~$600/kgas of [1]SpaceX target figure; not yet achieved in operational configuration ↓ Cheapest |
| Summary | CASIC's road-mobile, quick-response small solid launcher, operated commercially by ExPace since 2017 — one of the higher-cadence Chinese small-lift vehicles. | ULA's next-generation medium-heavy rocket replacing Atlas V. Powered by two BE-4 engines on the first stage and a cryogenic Centaur V upper stage. NSSL-certified March 2025; first NSSL mission USSF-106 flew Aug 13, 2025. Paused by the Space Force after the USSF-87 SRB nozzle anomaly (Feb 12, 2026), with return to flight expected ~late 2026. | Largest and most powerful rocket ever flown. Super Heavy booster uses 33 Raptor engines. V3 Ship debuted on Flight 12 (May 22, 2026) from Starbase Pad 2 — it reached space but broke up at the ocean surface, and the vehicle is grounded pending an FAA mishap review. Mechazilla booster catches demonstrated from Flight 5 (Oct 2024) onward; first payload deploy on Flight 10 (Aug 2025). Primary vehicle for the Artemis HLS lunar lander (Artemis III LEO docking demo 2027, first landing on Artemis IV). |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.