Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | CASC / CALT | Rocket Lab | Firefly Aerospace |
| Country | 🇨🇳 China | 🇺🇸 USA | 🇺🇸 USA |
| Status | Active | In Development | Active |
| Vehicle class | Heavy | Medium | Small |
| Propellant | UDMH/N₂O₄ (stages 1–2) + LH₂/LOX (stage 3 YF-75) | CH₄ / LOX | RP-1 / LOX |
| Reusable | No | Yes | No |
| Stages | 3 | 2 | 2 |
| First flight | 1996 | 2026 | 2021 |
| Payload to LEO | 11,200 kgas of [1] | 13,000 kgas of [1]Expendable; ~8,000 kg reusable with first-stage return ↑ Best | 1,030 kgas of [1]SSO capacity ~630 kg |
| Payload to GTO | 5,500 kgas of [1]With 4 strap-on liquid boosters (CZ-3B/E enhanced variant) ↑ Best | — | — |
| Height | 54.84 mas of [1] ↑ Best | ~40 mas of [1] | 29 mas of [1] |
| Liftoff mass | 426 tas of [1]Enhanced variant with 4 liquid strap-on boosters | ~481 tas of [1] ↑ Best | 54 tas of [1] |
| Success rate | ~95%as of [2]~6 failures/partial failures out of ~105+ flights; gradually being superseded by Long March 5 for GTO ↑ Best | — | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 |
| Total flights | ~105as of [2] ↑ Best | — | 7as of [2] |
| Cost / kg LEO | — | — | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO ↓ Cheapest |
| Summary | China's primary geostationary transfer vehicle for over 25 years. Launched communications, meteorology, and navigation satellites including Beidou-3 (GEO/IGSO nodes). Being phased out in favour of Long March 5 for heavier GTO payloads as newer domestic communications satellites grow in mass. | Rocket Lab's medium-lift reusable rocket targeting the $100B constellation replenishment market. Uses a 'hungry hippo' fairings design that opens at the top rather than traditional clamshell separation. First flight delayed to Q4 2026 after a Jan 2026 propellant tank test anomaly. | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.