Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Long March 6 (incl. 6A / 6C variants) 🇨🇳 China Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-07-26Remove × | ||
|---|---|---|---|
| Company | SAST (Shanghai Academy of Spaceflight Technology) / CASC | Arianespace / ArianeGroup | SpaceX |
| Country | 🇨🇳 China | 🇪🇺 Europe | 🇺🇸 USA |
| Status | Active | Retired | In Development |
| Vehicle class | Medium | Heavy | Super Heavy |
| Propellant | RP-1 / LOX (stages 1–2); N2O4/UDMH (stage 3, base variant) | LH₂ / LOX (Vulcain 2) + solid HTPB boosters | CH₄ / LOX |
| Reusable | No | No | Yes |
| Stages | 3 | 2 | 2 |
| First flight | 2015 | 1996 – 2023 | 2023 |
| Payload to LEO | 1,080 kg to SSO (base Long March 6)as of [1]Long March 6A (4 solid boosters, elongated stage 1): at least 4,000 kg to SSO. Long March 6C: similar class without the boosters. Both variants first flew from Taiyuan Satellite Launch Center. | 21,000 kgas of [1]Ariane 5 ECA configuration | ~150,000 kgas of [1]SpaceX projected max payload in fully expendable mode; ~100,000 kg reusable ↑ Best |
| Payload to GTO | — | 10,865 kgas of [1]ECA configuration. Ariane 5 ES (ATV) variant: 21,000 kg LEO | ~21,000 kgas of [1]Reusable configuration estimate ↑ Best |
| Height | 29 m (base variant)as of [1] | 54 mas of [1] | 121 mas of [1]Version 2 (V2) full stack Ship + Super Heavy ↑ Best |
| Liftoff mass | 103 t (base variant)as of [1] | 777 tas of [1] | ~5,000 tas of [1] ↑ Best |
| Success rate | 100% (base Long March 6, 15/15)as of [1]6A first flew 2022-03-29, 6C first flew 2024-05-07; both maintain perfect records within their own flight histories as of this date. ↑ Best | 97.5%as of [2]113/117 successes. Failures: V501 (Jun 1996, first flight), V63 (Dec 2002, off-course but payload recovered). 2 partial successes. | ~50%as of [2]Flights 1-12; ~6 complete mission successes (incl. Flights 10 and 11), remainder partial or vehicle lost. First payload deploy on Flight 10 (Aug 2025); Flight 12 (V3 debut) lost during descent. |
| Total flights | 15 (base variant)as of [1] | 117as of [2]VA261 (Jul 5, 2023) was the final Ariane 5 flight. Launched the James Webb Space Telescope (Dec 2021). ↑ Best | 12as of [2]Flight 1 (Apr 2023) through Flight 12 (May 22, 2026 — V3 debut from Pad 2). Flight 11 (Oct 13, 2025) closed out Block 2. |
| Cost / kg LEO | — | — | ~$600/kgas of [1]SpaceX target figure; not yet achieved in operational configuration ↓ Cheapest |
| Summary | A family of medium-lift launchers from SAST serving China's growing SSO/LEO commercial and government satellite demand, with the 6A and 6C variants adding solid boosters or a simplified expendable configuration respectively. | Europe's dominant heavy-lift rocket for 27 years. Its most famous payload: the James Webb Space Telescope (Dec 25, 2021). Retired Jul 5, 2023 to make way for Ariane 6. Responsible for launching over 250 commercial and scientific payloads including XMM-Newton, Rosetta, and BepiColombo. | Largest and most powerful rocket ever flown. Super Heavy booster uses 33 Raptor engines. V3 Ship debuted on Flight 12 (May 22, 2026) from Starbase Pad 2 — it reached space but broke up at the ocean surface, and the vehicle is grounded pending an FAA mishap review. Mechazilla booster catches demonstrated from Flight 5 (Oct 2024) onward; first payload deploy on Flight 10 (Aug 2025). Primary vehicle for the Artemis HLS lunar lander (Artemis III LEO docking demo 2027, first landing on Artemis IV). |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.