Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Long March 6 (incl. 6A / 6C variants) 🇨🇳 China Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-07-26Remove × | ||
|---|---|---|---|
| Company | SAST (Shanghai Academy of Spaceflight Technology) / CASC | Blue Origin | Arianespace / ArianeGroup |
| Country | 🇨🇳 China | 🇺🇸 USA | 🇪🇺 Europe |
| Status | Active | Active | Active |
| Vehicle class | Medium | Heavy | Heavy |
| Propellant | RP-1 / LOX (stages 1–2); N2O4/UDMH (stage 3, base variant) | LNG / LOX (BE-4); LH₂ / LOX (BE-3U second stage) | LH₂ / LOX (Vulcain 2.1 + Vinci) |
| Reusable | No | Yes | No |
| Stages | 3 | 2 | 2 |
| First flight | 2015 | 2025 | 2024 |
| Payload to LEO | 1,080 kg to SSO (base Long March 6)as of [1]Long March 6A (4 solid boosters, elongated stage 1): at least 4,000 kg to SSO. Long March 6C: similar class without the boosters. Both variants first flew from Taiyuan Satellite Launch Center. | 45,000 kgas of [1]Reusable first stage; expendable ~45,000 kg. GTO (reusable) ~13,000 kg. ↑ Best | 21,650 kgas of [1]Ariane 62 (2 boosters) / Ariane 64 (4 boosters); 64 offers higher GTO capacity |
| Payload to GTO | — | 13,000 kgas of [1]Reusable first stage configuration ↑ Best | 11,500 kgas of [1]Ariane 64 configuration. Ariane 62 delivers ~4,500 kg to GTO. |
| Height | 29 m (base variant)as of [1] | 98 mas of [1] | 56–63 mas of [1]56 m (Ariane 62) / 63 m (Ariane 64 with 4 solid boosters) ↑ Best |
| Liftoff mass | 103 t (base variant)as of [1] | 1,016 tas of [1] | 530–860 tas of [1]530 t (A62) / 860 t (A64) ↑ Best |
| Success rate | 100% (base Long March 6, 15/15)as of [1]6A first flew 2022-03-29, 6C first flew 2024-05-07; both maintain perfect records within their own flight histories as of this date. ↑ Best | 67%as of [2]NG-1 (Jan 2025) full mission success, booster lost; NG-2 (Nov 2025) success + first Jacklyn booster landing; NG-3 (Apr 2026) partial — payload in wrong orbit, FAA grounded | 100%as of [2]8/8 missions through VA269 Amazon Leo (Jun 17, 2026, 36 sats on upgraded P160C boosters); Ariane 64 debut Feb 12, 2026 |
| Total flights | 15 (base variant)as of [1] ↑ Best | 3as of [2] | 8as of [2] |
| Cost / kg LEO | — | ~$1,500/kgas of [1]Estimated from ~$67M commercial pricing / 45,000 kg payload capacity ↓ Cheapest | ~$7,500/kgas of [1]Estimate based on ~$115M A62 / ~$165M A64 list prices |
| Summary | A family of medium-lift launchers from SAST serving China's growing SSO/LEO commercial and government satellite demand, with the 6A and 6C variants adding solid boosters or a simplified expendable configuration respectively. | Blue Origin's first orbital rocket. The 7-meter payload fairing is the widest of any current production rocket. NG-2 (Nov 2025) achieved the company's first booster landing on drone ship Jacklyn. On May 28, 2026 a vehicle was destroyed in a prelaunch static-fire explosion at LC-36. Damage proved less severe than first feared — Blue Origin (CEO Dave Limp) reported the propellant tanks and water tower were undamaged, the launch tower repairable rather than replaced, and stored first/second stages intact, with LC-36 debris cleared within ~9 days. The company has started reconstruction and now targets a return to flight before the end of 2026 (a timeline some observers call aggressive). | Europe's flagship launcher replacing Ariane 5. The Vinci re-ignitable upper stage enables multi-orbit missions and controlled deorbit. Primary customers: Amazon Kuiper, European government payloads, and ESA science missions. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.