Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | CASC / CALT | Khrunichev / Roscosmos | Rocket Lab |
| Country | 🇨🇳 China | 🇷🇺 Russia | 🇺🇸 USA |
| Status | Active | Active | In Development |
| Vehicle class | Medium | Heavy | Medium |
| Propellant | RP-1 / LOX (YF-100 + YF-115) | RP-1 / LOX (RD-191, all 5 modules) | CH₄ / LOX |
| Reusable | No | No | Yes |
| Stages | 2 | 2 | 2 |
| First flight | 2016 | 2014 | 2026 |
| Payload to LEO | 13,500 kgas of [1]SSO capacity ~5,500 kg | 24,500 kgas of [1]With KVTK cryogenic upper stage (planned); Briz-M gives ~5,400 kg GTO ↑ Best | 13,000 kgas of [1]Expendable; ~8,000 kg reusable with first-stage return |
| Payload to GTO | — | 5,400 kgas of [1]Briz-M upper stage. KVTK would raise this to ~7,500 kg. ↑ Best | — |
| Height | 53.1 mas of [1] | 64 mas of [1] ↑ Best | ~40 mas of [1] |
| Liftoff mass | 597 tas of [1] | 773 tas of [1] ↑ Best | ~481 tas of [1] |
| Success rate | 100%as of [2]12/12 missions, all Tianzhou ISS resupply or CZ-7 tech demo flights ↑ Best | 100%as of [2]4/4 mission successes: Dec 2014, Dec 2020, Mar 2023, Apr 2024 ↑ Best | — |
| Total flights | 12as of [2]Most recently Tianzhou-10 cargo to Tiangong (May 11, 2026) ↑ Best | 4as of [2] | — |
| Cost / kg LEO | — | — | — |
| Summary | China's workhorse medium-lift rocket, used exclusively for Tianzhou automated cargo missions to the Tiangong space station. Designed to replace the Long March 2F for high-cadence LEO/cargo missions. Uses the same YF-100 engines as Long March 5's boosters. | Russia's new-generation heavy-lift rocket built entirely of Russian-manufactured components — a political priority after Proton-M's dependence on Ukrainian components. Five URM-1 universal rocket modules share the same propellant (RP-1/LOX), unlike Proton-M's toxic hypergolics. Flight rate remains very low. | Rocket Lab's medium-lift reusable rocket targeting the $100B constellation replenishment market. Uses a 'hungry hippo' fairings design that opens at the top rather than traditional clamshell separation. First flight delayed to Q4 2026 after a Jan 2026 propellant tank test anomaly. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.