Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | SSLV (Small Satellite Launch Vehicle) 🇮🇳 India Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-07-26Remove × | ||
|---|---|---|---|
| Company | CASC / CALT | Rocket Lab | ISRO / Hindustan Aeronautics Limited |
| Country | 🇨🇳 China | 🇺🇸 USA | 🇮🇳 India |
| Status | Active | In Development | Active |
| Vehicle class | Medium | Medium | Small |
| Propellant | RP-1 / LOX (YF-100 + YF-115) | CH₄ / LOX | Solid (HTPB, stages 1–3) / MMH-MON3 liquid (velocity trimming module) |
| Reusable | No | Yes | No |
| Stages | 2 | 2 | 4 |
| First flight | 2016 | 2026 | 2022 |
| Payload to LEO | 13,500 kgas of [1]SSO capacity ~5,500 kg ↑ Best | 13,000 kgas of [1]Reusable configuration with downrange barge landing — this is the single payload figure Rocket Lab publishes. ~15,000 kg expendable. | 500 kgas of [1]500 km altitude, 35–55° inclination. 300 kg to 500 km SSO. |
| Payload to GTO | — | — | — |
| Height | 53.1 mas of [1] ↑ Best | 43 mas of [1] | 34 mas of [1] |
| Liftoff mass | 597 tas of [1] ↑ Best | ~481 tas of [1] | 120 tas of [1] |
| Success rate | 100%as of [2]12/12 missions, all Tianzhou ISS resupply or CZ-7 tech demo flights | — | 2/3 (67%)as of [1]First flight (Aug 2022) partial failure — satellites reached a lower-than-planned orbit. Second and third flights successful. ↑ Best |
| Total flights | 12as of [2]Most recently Tianzhou-10 cargo to Tiangong (May 11, 2026) ↑ Best | — | 3as of [1] |
| Cost / kg LEO | — | — | ₹30–35 crore per launch (~$3.1M–$3.6M)as of [1]Total launch price, not a per-kg figure. ↓ Cheapest |
| Summary | China's workhorse medium-lift rocket, used exclusively for Tianzhou automated cargo missions to the Tiangong space station. Designed to replace the Long March 2F for high-cadence LEO/cargo missions. Uses the same YF-100 engines as Long March 5's boosters. | Rocket Lab's medium-lift reusable rocket targeting the $100B constellation replenishment market. Uses a 'hungry hippo' fairings design that opens at the top rather than traditional clamshell separation. First flight delayed to Q4 2026 after a Jan 2026 propellant tank test anomaly. | ISRO's small-satellite launcher, designed for quick-turnaround dedicated smallsat missions. Full manufacturing, marketing and launch rights were transferred to Hindustan Aeronautics Limited in June 2025 under a technology-transfer agreement. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.