Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Nuri (KSLV-II) 🇰🇷 South Korea Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | CASC / CALT | KARI / Hanwha Aerospace | NASA / Boeing |
| Country | 🇨🇳 China | 🇰🇷 South Korea | 🇺🇸 USA |
| Status | Active | Active | Active |
| Vehicle class | Medium | Medium | Super Heavy |
| Propellant | RP-1 / LOX (YF-100 + YF-115) | RP-1 / LOX (KRE-075 engines all stages) | LH₂ / LOX (RS-25); solid HTPB (SRBs) |
| Reusable | No | No | No |
| Stages | 2 | 3 | 2 |
| First flight | 2016 | 2021 | 2022 |
| Payload to LEO | 13,500 kgas of [1]SSO capacity ~5,500 kg | 2,600 kgas of [1]600 km SSO target orbit | 95,000 kgas of [1] ↑ Best |
| Payload to GTO | — | — | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best |
| Height | 53.1 mas of [1] | 47.2 mas of [1] | 98.1 mas of [1] ↑ Best |
| Liftoff mass | 597 tas of [1] | 200 tas of [1] | 2,608 tas of [1] ↑ Best |
| Success rate | 100%as of [2]12/12 missions, all Tianzhou ISS resupply or CZ-7 tech demo flights ↑ Best | 75%as of [2]3/4 full successes: TF1 (Oct 2021) partial, TF2 (Jun 2022) success, TF3 (May 2023) success, TF4 (Nov 27, 2025 — first Hanwha-led production launch) success | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) ↑ Best |
| Total flights | 12as of [2]Most recently Tianzhou-10 cargo to Tiangong (May 11, 2026) ↑ Best | 4as of [2] | 2as of [2] |
| Cost / kg LEO | — | — | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost ↓ Cheapest |
| Summary | China's workhorse medium-lift rocket, used exclusively for Tianzhou automated cargo missions to the Tiangong space station. Designed to replace the Long March 2F for high-cadence LEO/cargo missions. Uses the same YF-100 engines as Long March 5's boosters. | South Korea's first domestically developed and produced launch vehicle, designed entirely without foreign engine technology. Nuri TF4 (Nov 2025) was the first launch managed by Hanwha Aerospace rather than KARI — marking the transition to commercial operation. KASA (Korea Aerospace Administration) took over programme oversight in 2024. | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.