Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Long March 8 (incl. 8A) 🇨🇳 China Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-07-26Remove × | ||
|---|---|---|---|
| Company | China Academy of Launch Vehicle Technology (CALT) / CASC | Gilmour Space Technologies | NASA / Boeing |
| Country | 🇨🇳 China | 🇦🇺 Australia | 🇺🇸 USA |
| Status | Active | In Development | Active |
| Vehicle class | Medium | Small | Super Heavy |
| Propellant | RP-1 / LOX (stage 1); LH2/LOX (stage 2) | Hybrid (Sirius motors, stages 1–2) / liquid (Phoenix engine, stage 3) | LH₂ / LOX (RS-25); solid HTPB (SRBs) |
| Reusable | No | No | No |
| Stages | 2 | 3 | 2 |
| First flight | 2020 | 2025 | 2022 |
| Payload to LEO | 8,100 kgas of [1]5,000 kg to 700 km SSO (base); the enlarged-second-stage 8A variant (first flew 2025-02-11) lifts 7,000 kg to the same SSO reference orbit. | 300 kgas of [1] | 95,000 kgas of [1] ↑ Best |
| Payload to GTO | — | — | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best |
| Height | 50.3 mas of [1] | 25 mas of [1] | 98.1 mas of [1] ↑ Best |
| Liftoff mass | 356 t (base); 371 t (8A)as of [1] ↑ Best | — | 2,608 tas of [1] |
| Success rate | 100% (16/16 combined base + 8A)as of [1] ↑ Best | 0/1as of [1]Maiden flight 2025-07-30 crashed 14 seconds after launch (insufficient thrust), from Bowen Orbital Spaceport, Queensland — Australia's first domestic orbital launch attempt. Preceded by two scrubs (2025-05-15 electrical issue, 2025-05-16 fairing anomaly). A second test flight was slated for early 2026. Block 2 (1,000 kg payload) and Eris Heavy (4,000 kg payload) variants are planned. | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) |
| Total flights | 16 (base + 8A combined)as of [1] ↑ Best | 1as of [1] | 2as of [2] |
| Cost / kg LEO | — | — | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost ↓ Cheapest |
| Summary | A two-stage medium-lift launcher originally designed with a reusable combined-booster-recovery concept in mind, though currently operational vehicles fly expendable. Exclusively from Wenchang. | Australia's first domestically developed orbital launch vehicle attempt, using a hybrid-propellant first and second stage; the maiden flight failed 14 seconds after liftoff in July 2025. | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.