Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Long March 8 (incl. 8A) 🇨🇳 China Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-07-26Remove × | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | |
|---|---|---|---|
| Company | China Academy of Launch Vehicle Technology (CALT) / CASC | ULA | ISRO |
| Country | 🇨🇳 China | 🇺🇸 USA | 🇮🇳 India |
| Status | Active | Active | Active |
| Vehicle class | Medium | Heavy | Heavy |
| Propellant | RP-1 / LOX (stage 1); LH2/LOX (stage 2) | LNG / LOX (BE-4); LH₂ / LOX (Centaur V) | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) |
| Reusable | No | No | No |
| Stages | 2 | 2 | 3 |
| First flight | 2020 | 2024 | 2017 |
| Payload to LEO | 8,100 kgas of [1]5,000 kg to 700 km SSO (base); the enlarged-second-stage 8A variant (first flew 2025-02-11) lifts 7,000 kg to the same SSO reference orbit. | 27,200 kgas of [1]VC2S configuration (2 solid strap-on boosters) ↑ Best | 10,000 kgas of [1] |
| Payload to GTO | — | 14,400 kgas of [1] ↑ Best | 4,000 kgas of [1] |
| Height | 50.3 mas of [1] | 61.6 mas of [1] ↑ Best | 43.43 mas of [1] |
| Liftoff mass | 356 t (base); 371 t (8A)as of [1] ↑ Best | 591 tas of [1]VC2S configuration | 643 tas of [1] |
| Success rate | 100% (16/16 combined base + 8A)as of [1] ↑ Best | 100%as of [2]4/4 payloads delivered: Cert-1 (Jan 2024), Cert-2 (Oct 2024, SRB nozzle anomaly), USSF-106 (Aug 13, 2025 — flight 3, first NSSL mission), USSF-87 (Feb 12, 2026 — flight 4, second SRB nozzle anomaly; Space Force paused Vulcan launches, RTF ~late 2026) | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. |
| Total flights | 16 (base + 8A combined)as of [1] ↑ Best | 4as of [2] | 10as of [2] |
| Cost / kg LEO | — | ~$5,500/kgas of [1]Estimated; list pricing not public. Priced below Atlas V, above Ariane 6. | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest |
| Summary | A two-stage medium-lift launcher originally designed with a reusable combined-booster-recovery concept in mind, though currently operational vehicles fly expendable. Exclusively from Wenchang. | ULA's next-generation medium-heavy rocket replacing Atlas V. Powered by two BE-4 engines on the first stage and a cryogenic Centaur V upper stage. NSSL-certified March 2025; first NSSL mission USSF-106 flew Aug 13, 2025. Paused by the Space Force after the USSF-87 SRB nozzle anomaly (Feb 12, 2026), with return to flight expected ~late 2026. | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.