Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | PLD Space | ISRO | NASA / Boeing |
| Country | 🇪🇸 Spain | 🇮🇳 India | 🇺🇸 USA |
| Status | In Development | Active | Active |
| Vehicle class | Small | Medium | Super Heavy |
| Propellant | RP-1 / LOX | Solid (PS1/PS3) + UDMH/N₂O₄ (PS2/PS4) — 4 alternating stages | LH₂ / LOX (RS-25); solid HTPB (SRBs) |
| Reusable | Yes | No | No |
| Stages | 2 | 4 | 2 |
| First flight | 2026 | 1993 | 2022 |
| Payload to LEO | 1,080 kgas of [1]540 kg to SSO. First flight is a stated plan (targeted Q1 2026 as of this research; not yet confirmed flown) — treat as a target, not a fact. | 3,800 kgas of [1]PSLV-XL with 6 extended solid strap-ons. Standard PSLV-G: 3,250 kg LEO. SSO: ~1,750 kg | 95,000 kgas of [1] ↑ Best |
| Payload to GTO | — | — | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best |
| Height | 35.7 mas of [1] | 44 mas of [1] | 98.1 mas of [1] ↑ Best |
| Liftoff mass | 69 tas of [1] | 320 tas of [1]PSLV-XL configuration | 2,608 tas of [1] ↑ Best |
| Success rate | — | 93.7%as of [2]60/64 mission successes. Two consecutive recent failures: C61 (2024) and C62 (Jan 12, 2026, stage-3 anomaly, 16 satellites lost). | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) ↑ Best |
| Total flights | — | 64as of [2] ↑ Best | 2as of [2] |
| Cost / kg LEO | — | ~$4,000/kgas of [1]Estimated from commercial launch contracts ↓ Cheapest | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost |
| Summary | PLD Space's orbital small launcher with a recoverable first stage (engine thrust + parachutes), developed with ESA Future Launchers Preparatory Programme support; primary launch site is the Guiana Space Centre. | India's most reliable and frequently flown launch vehicle, operational since 1994. Set a world record in Feb 2017 by deploying 104 satellites in a single flight (Cartosat-2D + 103 microsats). Launched Chandrayaan-1 (2008), Mars Orbiter Mission (2013), and Aditya-L1 (2023). The dual C61/C62 failure streak raised concerns about aging solid motor design. The vehicle is on a return-to-flight campaign (not retired): PSLV-C63 (TDS-01 technology demonstrator), with strengthened third-stage/PS3 checks following the expert-committee (FAC) review, is targeted for late June / early July 2026. | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.