Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Rocket Lab | United Launch Alliance | Firefly Aerospace |
| Country | 🇺🇸 USA | 🇺🇸 USA | 🇺🇸 USA |
| Status | In Development | Retired | Active |
| Vehicle class | Medium | Heavy | Small |
| Propellant | CH₄ / LOX | LH2 / LOX | RP-1 / LOX |
| Reusable | Yes | No | No |
| Stages | 2 | 2 | 2 |
| First flight | 2026 | 2004 – 2024 | 2021 |
| Payload to LEO | 13,000 kgas of [1]Reusable configuration with downrange barge landing — this is the single payload figure Rocket Lab publishes. ~15,000 kg expendable. | 28,370 kgas of [1] ↑ Best | 1,030 kgas of [1]SSO capacity ~630 kg |
| Payload to GTO | — | — | — |
| Height | 43 mas of [1] | 70.7 mas of [1] ↑ Best | 29 mas of [1] |
| Liftoff mass | ~481 tas of [1] | 733 tas of [1] ↑ Best | 54 tas of [1] |
| Success rate | — | 93.75% (15/16 full success, 1 partial failure)as of [1] ↑ Best | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 |
| Total flights | — | 16as of [1] ↑ Best | 7as of [2] |
| Cost / kg LEO | — | — | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO ↓ Cheapest |
| Summary | Rocket Lab's medium-lift reusable rocket targeting the $100B constellation replenishment market. Uses a 'hungry hippo' fairings design that opens at the top rather than traditional clamshell separation. First flight delayed to Q4 2026 after a Jan 2026 propellant tank test anomaly. | ULA's triple-common-booster-core heavy-lift launcher, retired 2024-04-09 after its final flight; superseded by Vulcan Centaur, which ULA states offers similar heavy-lift capability at lower cost. | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.