Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | SSLV (Small Satellite Launch Vehicle) 🇮🇳 India Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-07-26Remove × | ||
|---|---|---|---|
| Company | Rocket Lab | Isar Aerospace | ISRO / Hindustan Aeronautics Limited |
| Country | 🇺🇸 USA | 🇩🇪 Germany | 🇮🇳 India |
| Status | In Development | In Development | Active |
| Vehicle class | Medium | Small | Small |
| Propellant | CH₄ / LOX | LOX / kerosene (~80% manufactured in-house) | Solid (HTPB, stages 1–3) / MMH-MON3 liquid (velocity trimming module) |
| Reusable | Yes | No | No |
| Stages | 2 | 2 | 4 |
| First flight | 2026 | 2025 | 2022 |
| Payload to LEO | 13,000 kgas of [1]Reusable configuration with downrange barge landing — this is the single payload figure Rocket Lab publishes. ~15,000 kg expendable. ↑ Best | 1,000 kgas of [1] | 500 kgas of [1]500 km altitude, 35–55° inclination. 300 kg to 500 km SSO. |
| Payload to GTO | — | — | — |
| Height | 43 mas of [1] ↑ Best | — | 34 mas of [1] |
| Liftoff mass | ~481 tas of [1] ↑ Best | — | 120 tas of [1] |
| Success rate | — | 0/1 (first flight failed)as of [1]First flight from Andøya Spaceport (2025-03-30): liftoff succeeded but the rocket was terminated ~30 seconds in after a vent valve opened unexpectedly, causing loss of attitude control. Second flight ('Onward and Upward') repeatedly delayed through 2026 (weather, a safety-zone fishing vessel, a composite pressure vessel leak, then off-nominal fluid-system behavior as of 2026-06-15) — not yet flown as of this research. | 2/3 (67%)as of [1]First flight (Aug 2022) partial failure — satellites reached a lower-than-planned orbit. Second and third flights successful. ↑ Best |
| Total flights | — | 1as of [1] | 3as of [1] ↑ Best |
| Cost / kg LEO | — | — | ₹30–35 crore per launch (~$3.1M–$3.6M)as of [1]Total launch price, not a per-kg figure. ↓ Cheapest |
| Summary | Rocket Lab's medium-lift reusable rocket targeting the $100B constellation replenishment market. Uses a 'hungry hippo' fairings design that opens at the top rather than traditional clamshell separation. First flight delayed to Q4 2026 after a Jan 2026 propellant tank test anomaly. | Germany's first orbital-class launcher attempt; its first flight in March 2025 was Western Europe's first orbital launch attempt from the European mainland. A qualification second flight carrying CubeSats and ESA experiments has slipped repeatedly through 2026. | ISRO's small-satellite launcher, designed for quick-turnaround dedicated smallsat missions. Full manufacturing, marketing and launch rights were transferred to Hindustan Aeronautics Limited in June 2025 under a technology-transfer agreement. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.