The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | SSLV (Small Satellite Launch Vehicle) 🇮🇳 India Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-07-26Remove × | ||
|---|---|---|---|
| Company | Rocket Lab | ISRO / Hindustan Aeronautics Limited | JAXA / Mitsubishi Heavy Industries |
| Country | 🇺🇸 USA | 🇮🇳 India | 🇯🇵 Japan |
| Status | In Development | Active | Active |
| Vehicle class | Medium | Small | Heavy |
| Propellant | CH₄ / LOX | Solid (HTPB, stages 1–3) / MMH-MON3 liquid (velocity trimming module) | LH₂ / LOX (LE-9 first stage + LE-5B-3 second stage) |
| Reusable | Yes | No | No |
| Stages | 2 | 4 | 2 |
| First flight | 2026 | 2022 | 2023 |
| Payload to LEO | 13,000 kgas of [1]Reusable configuration with downrange barge landing — this is the single payload figure Rocket Lab publishes. ~15,000 kg expendable. | 500 kgas of [1]500 km altitude, 35–55° inclination. 300 kg to 500 km SSO. | 16,500 kgas of [1]H3-24 (2 SRB-3 + 4 LE-9 engines) configuration. H3-30 baseline: 16,500 kg. ↑ Best |
| Payload to GTO | — | — | 6,500 kgas of [1] ↑ Best |
| Height | 43 mas of [1] | 34 mas of [1] | 57 mas of [1] ↑ Best |
| Liftoff mass | ~481 tas of [1] | 120 tas of [1] | 574 tas of [1]H3-24S configuration ↑ Best |
| Success rate | — | 2/3 (67%)as of [1]First flight (Aug 2022) partial failure — satellites reached a lower-than-planned orbit. Second and third flights successful. ↑ Best | 78%as of [2]~7/9 successes. TF1 (Mar 7, 2023) first flight failure (2nd-stage ignition, DAICHI-3 lost). F8 (Dec 23, 2025) QZS-5 lost to 2nd-stage relight anomaly. H3-30 maiden flight (Jun 12, 2026) successful. |
| Total flights | — | 3as of [1] | 9as of [3]Includes the H3-30 (three LE-9 engines, no SRBs) maiden flight on Jun 12, 2026 ↑ Best |
| Cost / kg LEO | — | ₹30–35 crore per launch (~$3.1M–$3.6M)as of [1]Total launch price, not a per-kg figure. | ~$5,500/kgas of [1]Target unit price ¥5B (~$35M at ¥145/$); roughly half H-IIA's per-launch cost ↓ Cheapest |
| Summary | Rocket Lab's medium-lift reusable rocket targeting the $100B constellation replenishment market. Uses a 'hungry hippo' fairings design that opens at the top rather than traditional clamshell separation. First flight delayed to Q4 2026 after a Jan 2026 propellant tank test anomaly. | ISRO's small-satellite launcher, designed for quick-turnaround dedicated smallsat missions. Full manufacturing, marketing and launch rights were transferred to Hindustan Aeronautics Limited in June 2025 under a technology-transfer agreement. | Japan's next-generation flagship rocket designed to halve H-IIA costs. Uses LE-9 engines burning liquid hydrogen — the highest-performing expander-cycle engines in the world. First flight TF1 (Mar 7, 2023) failed; first success was TF2 (Feb 17, 2024). HTV-X1 cargo mission to ISS (Oct 2025) demonstrated operational readiness, and the solid-booster-free H3-30 variant debuted Jun 12, 2026. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.