Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Long March 8 (incl. 8A) 🇨🇳 China Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-07-26Remove × | ||
|---|---|---|---|
| Company | Blue Origin | ExPace (CASIC subsidiary) | China Academy of Launch Vehicle Technology (CALT) / CASC |
| Country | 🇺🇸 USA | 🇨🇳 China | 🇨🇳 China |
| Status | Active | Active | Active |
| Vehicle class | Heavy | Small | Medium |
| Propellant | LNG / LOX (BE-4); LH₂ / LOX (BE-3U second stage) | Solid (3 stages) + liquid-fueled 4th stage | RP-1 / LOX (stage 1); LH2/LOX (stage 2) |
| Reusable | Yes | No | No |
| Stages | 2 | 4 | 2 |
| First flight | 2025 | 2017 | 2020 |
| Payload to LEO | 45,000 kgas of [1]Reusable first stage; expendable ~45,000 kg. GTO (reusable) ~13,000 kg. ↑ Best | 400 kgas of [1] | 8,100 kgas of [1]5,000 kg to 700 km SSO (base); the enlarged-second-stage 8A variant (first flew 2025-02-11) lifts 7,000 kg to the same SSO reference orbit. |
| Payload to GTO | 13,000 kgas of [1]Reusable first stage configuration ↑ Best | — | — |
| Height | 98 mas of [1] ↑ Best | 19.4 mas of [1] | 50.3 mas of [1] |
| Liftoff mass | 1,016 tas of [1] | 30 tas of [1]Transporter-erector-launcher (TEL) capable — road-mobile solid launcher. | 356 t (base); 371 t (8A)as of [1] ↑ Best |
| Success rate | 67%as of [2]NG-1 (Jan 2025) full mission success, booster lost; NG-2 (Nov 2025) success + first Jacklyn booster landing; NG-3 (Apr 2026) partial — payload in wrong orbit, FAA grounded | ~85% (23 successes, 3 failures, 1 partial failure of 27)as of [1] ↑ Best | 100% (16/16 combined base + 8A)as of [1] |
| Total flights | 3as of [2] | 27as of [1] | 16 (base + 8A combined)as of [1] ↑ Best |
| Cost / kg LEO | ~$1,500/kgas of [1]Estimated from ~$67M commercial pricing / 45,000 kg payload capacity ↓ Cheapest | — | — |
| Summary | Blue Origin's first orbital rocket. The 7-meter payload fairing is the widest of any current production rocket. NG-2 (Nov 2025) achieved the company's first booster landing on drone ship Jacklyn. On May 28, 2026 a vehicle was destroyed in a prelaunch static-fire explosion at LC-36. Damage proved less severe than first feared — Blue Origin (CEO Dave Limp) reported the propellant tanks and water tower were undamaged, the launch tower repairable rather than replaced, and stored first/second stages intact, with LC-36 debris cleared within ~9 days. The company has started reconstruction and now targets a return to flight before the end of 2026 (a timeline some observers call aggressive). | CASIC's road-mobile, quick-response small solid launcher, operated commercially by ExPace since 2017 — one of the higher-cadence Chinese small-lift vehicles. | A two-stage medium-lift launcher originally designed with a reusable combined-booster-recovery concept in mind, though currently operational vehicles fly expendable. Exclusively from Wenchang. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.