Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Nuri (KSLV-II) 🇰🇷 South Korea Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | |
|---|---|---|---|
| Company | KARI / Hanwha Aerospace | ISRO | SpaceX |
| Country | 🇰🇷 South Korea | 🇮🇳 India | 🇺🇸 USA |
| Status | Active | Active | Active |
| Vehicle class | Medium | Heavy | Medium |
| Propellant | RP-1 / LOX (KRE-075 engines all stages) | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | RP-1 / LOX |
| Reusable | No | No | Yes |
| Stages | 3 | 3 | 2 |
| First flight | 2021 | 2017 | 2010 |
| Payload to LEO | 2,600 kgas of [1]600 km SSO target orbit | 10,000 kgas of [1] | 22,800 kgas of [1]Reusable first stage (expended gives 22,800 kg; reused gives ~15,600 kg) ↑ Best |
| Payload to GTO | — | 4,000 kgas of [1] | 8,300 kgas of [1]Expendable configuration. Reusable GTO capacity ~5,500 kg. ↑ Best |
| Height | 47.2 mas of [1] | 43.43 mas of [1] | 70 mas of [1] ↑ Best |
| Liftoff mass | 200 tas of [1] | 643 tas of [1] ↑ Best | 549 tas of [1] |
| Success rate | 75%as of [2]3/4 full successes: TF1 (Oct 2021) partial, TF2 (Jun 2022) success, TF3 (May 2023) success, TF4 (Nov 27, 2025 — first Hanwha-led production launch) success | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | 99.5%as of [2]634/637 full successes; Block 5 alone 580/581 = 99.8% |
| Total flights | 4as of [2] | 10as of [2] | 637as of [2] ↑ Best |
| Cost / kg LEO | — | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) | ~$2,720/kgas of [1]Based on $67M list price / 22,800 kg LEO (expendable) ↓ Cheapest |
| Summary | South Korea's first domestically developed and produced launch vehicle, designed entirely without foreign engine technology. Nuri TF4 (Nov 2025) was the first launch managed by Hanwha Aerospace rather than KARI — marking the transition to commercial operation. KASA (Korea Aerospace Administration) took over programme oversight in 2024. | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | The world's most frequently flown orbital rocket. Block 5 first stages have landed over 280 times and reflown up to 23 times. Backbone of Starlink and commercial crewed launches. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.