Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | ISRO | Firefly Aerospace | Isar Aerospace |
| Country | 🇮🇳 India | 🇺🇸 USA | 🇩🇪 Germany |
| Status | Active | Active | In Development |
| Vehicle class | Medium | Small | Small |
| Propellant | Solid (PS1/PS3) + UDMH/N₂O₄ (PS2/PS4) — 4 alternating stages | RP-1 / LOX | LOX / kerosene (~80% manufactured in-house) |
| Reusable | No | No | No |
| Stages | 4 | 2 | 2 |
| First flight | 1993 | 2021 | 2025 |
| Payload to LEO | 3,800 kgas of [1]PSLV-XL with 6 extended solid strap-ons. Standard PSLV-G: 3,250 kg LEO. SSO: ~1,750 kg ↑ Best | 1,030 kgas of [1]SSO capacity ~630 kg | 1,000 kgas of [1] |
| Payload to GTO | — | — | — |
| Height | 44 mas of [1] ↑ Best | 29 mas of [1] | — |
| Liftoff mass | 320 tas of [1]PSLV-XL configuration ↑ Best | 54 tas of [1] | — |
| Success rate | 93.7%as of [2]60/64 mission successes. Two consecutive recent failures: C61 (2024) and C62 (Jan 12, 2026, stage-3 anomaly, 16 satellites lost). ↑ Best | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 | 0/1 (first flight failed)as of [1]First flight from Andøya Spaceport (2025-03-30): liftoff succeeded but the rocket was terminated ~30 seconds in after a vent valve opened unexpectedly, causing loss of attitude control. Second flight ('Onward and Upward') repeatedly delayed through 2026 (weather, a safety-zone fishing vessel, a composite pressure vessel leak, then off-nominal fluid-system behavior as of 2026-06-15) — not yet flown as of this research. |
| Total flights | 64as of [2] ↑ Best | 7as of [2] | 1as of [1] |
| Cost / kg LEO | ~$4,000/kgas of [1]Estimated from commercial launch contracts ↓ Cheapest | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO | — |
| Summary | India's most reliable and frequently flown launch vehicle, operational since 1994. Set a world record in Feb 2017 by deploying 104 satellites in a single flight (Cartosat-2D + 103 microsats). Launched Chandrayaan-1 (2008), Mars Orbiter Mission (2013), and Aditya-L1 (2023). The dual C61/C62 failure streak raised concerns about aging solid motor design. The vehicle is on a return-to-flight campaign (not retired): PSLV-C63 (TDS-01 technology demonstrator), with strengthened third-stage/PS3 checks following the expert-committee (FAC) review, is targeted for late June / early July 2026. | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. | Germany's first orbital-class launcher attempt; its first flight in March 2025 was Western Europe's first orbital launch attempt from the European mainland. A qualification second flight carrying CubeSats and ESA experiments has slipped repeatedly through 2026. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.