Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | NASA / Boeing | Northrop Grumman | CASC / CALT |
| Country | 🇺🇸 USA | 🇺🇸 USA | 🇨🇳 China |
| Status | Active | Retired | Active |
| Vehicle class | Super Heavy | Medium | Medium |
| Propellant | LH₂ / LOX (RS-25); solid HTPB (SRBs) | RP-1 / LOX (RD-181 first stage) | RP-1 / LOX (YF-100 + YF-115) |
| Reusable | No | No | No |
| Stages | 2 | 2 | 2 |
| First flight | 2022 | 2013 – 2023 | 2016 |
| Payload to LEO | 95,000 kgas of [1] ↑ Best | 8,000 kgas of [1]Antares 230+ configuration; primarily used for ~3,500–3,800 kg Cygnus cargo | 13,500 kgas of [1]SSO capacity ~5,500 kg |
| Payload to GTO | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best | — | — |
| Height | 98.1 mas of [1] ↑ Best | 41 mas of [1] | 53.1 mas of [1] |
| Liftoff mass | 2,608 tas of [1] ↑ Best | 298 tas of [1] | 597 tas of [1] |
| Success rate | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) ↑ Best | 91.7%as of [2]11/12 successes; Orb-3 (CRS-3) exploded at liftoff Oct 2014 | 100%as of [2]12/12 missions, all Tianzhou ISS resupply or CZ-7 tech demo flights ↑ Best |
| Total flights | 2as of [2] | 12as of [2]Final Antares flight was NG-19 (Aug 1, 2023). NG-20+ moved to Falcon 9 due to Antares RD-181 engine supply disruption (Russia sanctions). ↑ Best | 12as of [2]Most recently Tianzhou-10 cargo to Tiangong (May 11, 2026) ↑ Best |
| Cost / kg LEO | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost ↓ Cheapest | — | — |
| Summary | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. | Primary launch vehicle for Cygnus ISS cargo missions from 2013–2023. Its Ukrainian-built Zenit-derived first stage and Russian RD-181 engines became untenable after the 2022 invasion of Ukraine. Northrop switched NG-20 onward to Falcon 9 while Antares 330 (with Firefly Miranda engines) is in development. | China's workhorse medium-lift rocket, used exclusively for Tianzhou automated cargo missions to the Tiangong space station. Designed to replace the Long March 2F for high-cadence LEO/cargo missions. Uses the same YF-100 engines as Long March 5's boosters. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.