Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | NASA / Boeing | ULA | ExPace (CASIC subsidiary) |
| Country | 🇺🇸 USA | 🇺🇸 USA | 🇨🇳 China |
| Status | Active | Active | Active |
| Vehicle class | Super Heavy | Medium | Small |
| Propellant | LH₂ / LOX (RS-25); solid HTPB (SRBs) | RP-1 / LOX (RD-180); LH₂ / LOX (Centaur III) | Solid (3 stages) + liquid upper stage |
| Reusable | No | No | No |
| Stages | 2 | 2 | 4 |
| First flight | 2022 | 2002 | 2020 |
| Payload to LEO | 95,000 kgas of [1] ↑ Best | 18,850 kgas of [1]401 configuration. Maximum 401/551 stretch to 20,520 kg. 551 max 29,420 kg (5-solid boosters). | 1,500 kgas of [1] |
| Payload to GTO | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best | 8,900 kgas of [1]551 configuration (maximum performance) | — |
| Height | 98.1 mas of [1] ↑ Best | 58.3 mas of [1]401 configuration | — |
| Liftoff mass | 2,608 tas of [1] ↑ Best | 334 tas of [1]401 configuration without strap-ons | 78 tas of [1]Transporter-erector-launcher (TEL) capable. |
| Success rate | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) | 99.1%as of [2]108 full successes + 1 partial failure (NROL-30, Jun 2007 — payload still reached usable orbit) across 109 launches | 80% (4/5)as of [1]Debut flight (2020-07-10) failed; returned to flight 2022-12-07 successfully. ↑ Best |
| Total flights | 2as of [2] | 109as of [2]No longer sold but still flying its backlog: ~8 launches remained as of Apr 2026 (6 Starliner + 2 Amazon Leo); most recent flight Amazon Leo LA-07 (May 29, 2026), ~7 remain ↑ Best | 5as of [1] |
| Cost / kg LEO | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost ↓ Cheapest | — | — |
| Summary | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. | ULA's workhorse since 2002 and the longest-serving active US rocket. Launched Mars Science Laboratory (Curiosity), OSIRIS-REx, Solar Orbiter, Lucy, New Horizons, and the Boeing Starliner. Production ended in 2024 and ULA no longer sells the vehicle, but it continues flying a sold-out backlog of Starliner and Amazon Leo missions into the late 2020s. | The larger sibling of Kuaizhou-1A, roughly 3.75x the payload class, road-mobile and solid-fueled, recovering commercial cadence after a 2020 debut failure. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.