Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | NASA / Boeing | ULA | PLD Space |
| Country | 🇺🇸 USA | 🇺🇸 USA | 🇪🇸 Spain |
| Status | Active | Active | In Development |
| Vehicle class | Super Heavy | Medium | Small |
| Propellant | LH₂ / LOX (RS-25); solid HTPB (SRBs) | RP-1 / LOX (RD-180); LH₂ / LOX (Centaur III) | RP-1 / LOX |
| Reusable | No | No | Yes |
| Stages | 2 | 2 | 2 |
| First flight | 2022 | 2002 | 2026 |
| Payload to LEO | 95,000 kgas of [1] ↑ Best | 18,850 kgas of [1]401 configuration. Maximum 401/551 stretch to 20,520 kg. 551 max 29,420 kg (5-solid boosters). | 1,080 kgas of [1]540 kg to SSO. First flight is a stated plan (targeted Q1 2026 as of this research; not yet confirmed flown) — treat as a target, not a fact. |
| Payload to GTO | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best | 8,900 kgas of [1]551 configuration (maximum performance) | — |
| Height | 98.1 mas of [1] ↑ Best | 58.3 mas of [1]401 configuration | 35.7 mas of [1] |
| Liftoff mass | 2,608 tas of [1] ↑ Best | 334 tas of [1]401 configuration without strap-ons | 69 tas of [1] |
| Success rate | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) ↑ Best | 99.1%as of [2]108 full successes + 1 partial failure (NROL-30, Jun 2007 — payload still reached usable orbit) across 109 launches | — |
| Total flights | 2as of [2] | 109as of [2]No longer sold but still flying its backlog: ~8 launches remained as of Apr 2026 (6 Starliner + 2 Amazon Leo); most recent flight Amazon Leo LA-07 (May 29, 2026), ~7 remain ↑ Best | — |
| Cost / kg LEO | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost ↓ Cheapest | — | — |
| Summary | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. | ULA's workhorse since 2002 and the longest-serving active US rocket. Launched Mars Science Laboratory (Curiosity), OSIRIS-REx, Solar Orbiter, Lucy, New Horizons, and the Boeing Starliner. Production ended in 2024 and ULA no longer sells the vehicle, but it continues flying a sold-out backlog of Starliner and Amazon Leo missions into the late 2020s. | PLD Space's orbital small launcher with a recoverable first stage (engine thrust + parachutes), developed with ESA Future Launchers Preparatory Programme support; primary launch site is the Guiana Space Centre. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.