Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | NASA / Boeing | Firefly Aerospace | Arianespace / ArianeGroup |
| Country | 🇺🇸 USA | 🇺🇸 USA | 🇪🇺 Europe |
| Status | Active | Active | Active |
| Vehicle class | Super Heavy | Small | Heavy |
| Propellant | LH₂ / LOX (RS-25); solid HTPB (SRBs) | RP-1 / LOX | LH₂ / LOX (Vulcain 2.1 + Vinci) |
| Reusable | No | No | No |
| Stages | 2 | 2 | 2 |
| First flight | 2022 | 2021 | 2024 |
| Payload to LEO | 95,000 kgas of [1] ↑ Best | 1,030 kgas of [1]SSO capacity ~630 kg | 21,650 kgas of [1]Ariane 62 (2 boosters) / Ariane 64 (4 boosters); 64 offers higher GTO capacity |
| Payload to GTO | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best | — | 11,500 kgas of [1]Ariane 64 configuration. Ariane 62 delivers ~4,500 kg to GTO. |
| Height | 98.1 mas of [1] | 29 mas of [1] | 56–63 mas of [1]56 m (Ariane 62) / 63 m (Ariane 64 with 4 solid boosters) ↑ Best |
| Liftoff mass | 2,608 tas of [1] | 54 tas of [1] | 530–860 tas of [1]530 t (A62) / 860 t (A64) ↑ Best |
| Success rate | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) ↑ Best | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 | 100%as of [2]7/7 missions through VA268 Amazon Leo (Apr 30, 2026); Ariane 64 debut Feb 12, 2026 ↑ Best |
| Total flights | 2as of [2] | 7as of [2] ↑ Best | 7as of [2] ↑ Best |
| Cost / kg LEO | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO | ~$7,500/kgas of [1]Estimate based on ~$115M A62 / ~$165M A64 list prices ↓ Cheapest |
| Summary | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. | Europe's flagship launcher replacing Ariane 5. The Vinci re-ignitable upper stage enables multi-orbit missions and controlled deorbit. Primary customers: Amazon Kuiper, European government payloads, and ESA science missions. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.