Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | NASA / Boeing | CASC / SAST | ISRO |
| Country | 🇺🇸 USA | 🇨🇳 China | 🇮🇳 India |
| Status | Active | Active | Active |
| Vehicle class | Super Heavy | Medium | Heavy |
| Propellant | LH₂ / LOX (RS-25); solid HTPB (SRBs) | UDMH / N₂O₄ (hypergolic all stages) | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) |
| Reusable | No | No | No |
| Stages | 2 | 2 | 3 |
| First flight | 2022 | 1992 | 2017 |
| Payload to LEO | 95,000 kgas of [1] ↑ Best | 3,500 kgas of [1]SSO capacity ~1,300 kg; standard LEO 3,500 kg | 10,000 kgas of [1] |
| Payload to GTO | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best | — | 4,000 kgas of [1] |
| Height | 98.1 mas of [1] ↑ Best | 41.06 mas of [1] | 43.43 mas of [1] |
| Liftoff mass | 2,608 tas of [1] ↑ Best | 232 tas of [1] | 643 tas of [1] |
| Success rate | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) ↑ Best | 98.7%as of [2]~77/78 successes; one known failure (CZ-2D Y7, Mar 1995 upper-stage anomaly) | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best |
| Total flights | 2as of [2] | ~78as of [2] ↑ Best | 10as of [2] |
| Cost / kg LEO | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost | — | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest |
| Summary | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. | China's most-used sun-synchronous and polar orbit workhorse for small-to-medium military and commercial Earth observation satellites. Launched from Jiuquan and Taiyuan. Uses storable hypergolic propellants for high launch-readiness but produces toxic exhaust. | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.