Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | NASA / Boeing | CASC / CALT | SpaceX |
| Country | 🇺🇸 USA | 🇨🇳 China | 🇺🇸 USA |
| Status | Active | Active | In Development |
| Vehicle class | Super Heavy | Heavy | Super Heavy |
| Propellant | LH₂ / LOX (RS-25); solid HTPB (SRBs) | LH₂ / LOX (YF-77 core) + RP-1/LOX (YF-100 boosters) | CH₄ / LOX |
| Reusable | No | No | Yes |
| Stages | 2 | 2 | 2 |
| First flight | 2022 | 2016 | 2023 |
| Payload to LEO | 95,000 kgas of [1] | 25,000 kgas of [1]CZ-5B variant (no upper stage) delivers 25,000 kg LEO for Tiangong station modules | ~150,000 kgas of [1]SpaceX projected max payload in fully expendable mode; ~100,000 kg reusable ↑ Best |
| Payload to GTO | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best | 14,000 kgas of [1]CZ-5 variant (with YF-75D upper stage) | ~21,000 kgas of [1]Reusable configuration estimate |
| Height | 98.1 mas of [1] | 56.97 mas of [1] | 121 mas of [1]Version 2 (V2) full stack Ship + Super Heavy ↑ Best |
| Liftoff mass | 2,608 tas of [1] | 869 tas of [1] | ~5,000 tas of [1] ↑ Best |
| Success rate | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) ↑ Best | 94.1%as of [2]16/17 successes (10 CZ-5 + 7 CZ-5B). Failure: CZ-5 Y2 (Jul 2017, engine anomaly); loss of Shijian-18 satellite. | ~55%as of [2]IFT-1 through IFT-11; ~6 complete mission successes, remainder partial or vehicle lost. No orbital payload deployment yet. |
| Total flights | 2as of [2] | 17as of [2] ↑ Best | 11as of [2]IFT-1 (Apr 2023) through IFT-11 (May 2026 target). IFT-10 (Aug 2025) achieved full mission: booster caught + Ship splash-down. |
| Cost / kg LEO | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost | — | ~$600/kgas of [1]SpaceX target figure; not yet achieved in operational configuration ↓ Cheapest |
| Summary | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. | China's most powerful operational rocket and the backbone of its flagship space programs. Launched Tianwen-1 to Mars, Chang'e 5 sample return, Chang'e 6 far-side sample return, all Tiangong core and lab modules, and the Xuntian space telescope. The CZ-5B variant delivers entire station modules in a single flight. | Largest and most powerful rocket ever flown. Super Heavy booster uses 33 Raptor engines. V3 Ship introduced Aug 2025. Mechazilla caught the booster on IFT-5 (Oct 2024) and IFT-10 (Aug 2025). Primary vehicle for Artemis HLS lunar landing (Artemis III planned 2026). |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.