Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | NASA / Boeing | Rocket Lab | JAXA / Mitsubishi Heavy Industries |
| Country | 🇺🇸 USA | 🇺🇸 USA | 🇯🇵 Japan |
| Status | Active | In Development | Retired |
| Vehicle class | Super Heavy | Medium | Medium |
| Propellant | LH₂ / LOX (RS-25); solid HTPB (SRBs) | CH₄ / LOX | LH₂ / LOX (LE-7A first stage + LE-5B second stage) |
| Reusable | No | Yes | No |
| Stages | 2 | 2 | 2 |
| First flight | 2022 | 2026 | 2001 – 2025 |
| Payload to LEO | 95,000 kgas of [1] ↑ Best | 13,000 kgas of [1]Expendable; ~8,000 kg reusable with first-stage return | 10,000 kgas of [1]202 configuration (2 SRB-A3 solid strap-ons) |
| Payload to GTO | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best | — | 4,100 kgas of [1]202 configuration |
| Height | 98.1 mas of [1] ↑ Best | ~40 mas of [1] | 53 mas of [1] |
| Liftoff mass | 2,608 tas of [1] ↑ Best | ~481 tas of [1] | 285 tas of [1]202 configuration |
| Success rate | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) ↑ Best | — | 98%as of [2]49/50 successes. Only failure: F6 (Nov 2003, MTSAT-1R lost due to SRB separation anomaly). Retired after Flight 50 (GOSAT-GW, Jun 28, 2025). |
| Total flights | 2as of [2] | — | 50as of [2]50 flights from 2001–2025. H3 replaces it from 2024 onward. ↑ Best |
| Cost / kg LEO | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost ↓ Cheapest | — | — |
| Summary | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. | Rocket Lab's medium-lift reusable rocket targeting the $100B constellation replenishment market. Uses a 'hungry hippo' fairings design that opens at the top rather than traditional clamshell separation. First flight delayed to Q4 2026 after a Jan 2026 propellant tank test anomaly. | Japan's flagship medium-lift rocket for 24 years, retiring after an exceptional 49/50 mission success record. Launched the SELENE lunar orbiter (2007), Akatsuki Venus probe (2010), Hayabusa2 (2014), SLIM lunar lander (2023), and the ALOS series Earth observation satellites. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.