Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | Roscosmos / Progress Rocket Space Centre | ISRO | JAXA / IHI Aerospace |
| Country | 🇷🇺 Russia | 🇮🇳 India | 🇯🇵 Japan |
| Status | Active | Active | Retired |
| Vehicle class | Medium | Heavy | Small |
| Propellant | RP-1 / LOX | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | Solid (HTPB — all stages) |
| Reusable | No | No | No |
| Stages | 3 | 3 | 3 |
| First flight | 2004 | 2017 | 2013 – 2022 |
| Payload to LEO | 8,200 kgas of [1]Soyuz-2.1b with Fregat upper stage; 2.1a variant ~7,020 kg LEO | 10,000 kgas of [1] ↑ Best | 590 kgas of [1]500 kg to SSO. Enhanced Epsilon (from E-4) added 700 kg LEO via PBS liquid kick stage. |
| Payload to GTO | 3,250 kgas of [1]With Fregat-M upper stage | 4,000 kgas of [1] ↑ Best | — |
| Height | 46.3 mas of [1] ↑ Best | 43.43 mas of [1] | 26 mas of [1] |
| Liftoff mass | 312 tas of [1] | 643 tas of [1] ↑ Best | 96 tas of [1] |
| Success rate | 97%as of [2]~160/165 mission successes since 2004 per aggregated launch logs | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | 83.3%as of [2]5/6 successes. E-6 (Oct 12, 2022) PBS upper stage failed to ignite, eight satellites lost. Epsilon S (next-generation) ground test anomaly Jan 2023 effectively ended the programme. |
| Total flights | ~165as of [2] ↑ Best | 10as of [2] | 6as of [2] |
| Cost / kg LEO | — | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest | — |
| Summary | Russia's primary medium-lift workhorse, descended from the Soyuz family that has flown since 1966. Carries both crewed Soyuz spacecraft and Cygnus-class cargo. Fregat upper stage significantly expands mission flexibility. Production continues at Samara (now TsSKB-Progress). | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | JAXA's small solid-fuel rocket derived from the M-V rocket heritage. Designed for highly autonomous operations — launch preparations could be managed by just 8 people. The sixth and final E-6 mission (Oct 2022) failed when the PBS kick stage didn't ignite; a ground explosion during Epsilon S testing (Jan 2023) ended the programme. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.