Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Isar Aerospace | Space One | ULA |
| Country | 🇩🇪 Germany | 🇯🇵 Japan | 🇺🇸 USA |
| Status | In Development | In Development | Active |
| Vehicle class | Small | Small | Heavy |
| Propellant | LOX / kerosene (~80% manufactured in-house) | Solid | LNG / LOX (BE-4); LH₂ / LOX (Centaur V) |
| Reusable | No | No | No |
| Stages | 2 | 4 | 2 |
| First flight | 2025 | 2024 | 2024 |
| Payload to LEO | 1,000 kgas of [1] | — | 27,200 kgas of [1]VC2S configuration (2 solid strap-on boosters) ↑ Best |
| Payload to GTO | — | — | 14,400 kgas of [1] ↑ Best |
| Height | — | — | 61.6 mas of [1] ↑ Best |
| Liftoff mass | — | — | 591 tas of [1]VC2S configuration ↑ Best |
| Success rate | 0/1 (first flight failed)as of [1]First flight from Andøya Spaceport (2025-03-30): liftoff succeeded but the rocket was terminated ~30 seconds in after a vent valve opened unexpectedly, causing loss of attitude control. Second flight ('Onward and Upward') repeatedly delayed through 2026 (weather, a safety-zone fishing vessel, a composite pressure vessel leak, then off-nominal fluid-system behavior as of 2026-06-15) — not yet flown as of this research. | 0/3 — three consecutive failuresas of [1]2024-03-13: disintegrated shortly after liftoff. 2024-12-18: began tumbling during 1st-stage burn, flight terminated. 2026-03-04: flight termination activated ~70 seconds after liftoff. All three launches flew from Spaceport Kii, Wakayama — Japan's first private-sector spaceport. Program grounded as of this research; precise payload/height/mass specs not confirmed from a primary source. | 100%as of [2]4/4 payloads delivered: Cert-1 (Jan 2024), Cert-2 (Oct 2024, SRB nozzle anomaly), USSF-106 (Aug 13, 2025 — flight 3, first NSSL mission), USSF-87 (Feb 12, 2026 — flight 4, second SRB nozzle anomaly; Space Force paused Vulcan launches, RTF ~late 2026) ↑ Best |
| Total flights | 1as of [1] | 3as of [1] | 4as of [2] ↑ Best |
| Cost / kg LEO | — | — | ~$5,500/kgas of [1]Estimated; list pricing not public. Priced below Atlas V, above Ariane 6. ↓ Cheapest |
| Summary | Germany's first orbital-class launcher attempt; its first flight in March 2025 was Western Europe's first orbital launch attempt from the European mainland. A qualification second flight carrying CubeSats and ESA experiments has slipped repeatedly through 2026. | A Japanese commercial solid-fuel small launcher that has failed on all three flight attempts through March 2026, putting its commercial viability in serious question. | ULA's next-generation medium-heavy rocket replacing Atlas V. Powered by two BE-4 engines on the first stage and a cryogenic Centaur V upper stage. NSSL-certified March 2025; first NSSL mission USSF-106 flew Aug 13, 2025. Paused by the Space Force after the USSF-87 SRB nozzle anomaly (Feb 12, 2026), with return to flight expected ~late 2026. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.