Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | SSLV (Small Satellite Launch Vehicle) 🇮🇳 India Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-07-26Remove × | ||
|---|---|---|---|
| Company | ISRO / Hindustan Aeronautics Limited | Gilmour Space Technologies | Northrop Grumman |
| Country | 🇮🇳 India | 🇦🇺 Australia | 🇺🇸 USA |
| Status | Active | In Development | Retired |
| Vehicle class | Small | Small | Medium |
| Propellant | Solid (HTPB, stages 1–3) / MMH-MON3 liquid (velocity trimming module) | Hybrid (Sirius motors, stages 1–2) / liquid (Phoenix engine, stage 3) | RP-1 / LOX (RD-181 first stage) |
| Reusable | No | No | No |
| Stages | 4 | 3 | 2 |
| First flight | 2022 | 2025 | 2013 – 2023 |
| Payload to LEO | 500 kgas of [1]500 km altitude, 35–55° inclination. 300 kg to 500 km SSO. | 300 kgas of [1] | 8,000 kgas of [1]Antares 230+ configuration; primarily used for ~3,500–3,800 kg Cygnus cargo ↑ Best |
| Payload to GTO | — | — | — |
| Height | 34 mas of [1] | 25 mas of [1] | 41 mas of [1] ↑ Best |
| Liftoff mass | 120 tas of [1] | — | 298 tas of [1] ↑ Best |
| Success rate | 2/3 (67%)as of [1]First flight (Aug 2022) partial failure — satellites reached a lower-than-planned orbit. Second and third flights successful. ↑ Best | 0/1as of [1]Maiden flight 2025-07-30 crashed 14 seconds after launch (insufficient thrust), from Bowen Orbital Spaceport, Queensland — Australia's first domestic orbital launch attempt. Preceded by two scrubs (2025-05-15 electrical issue, 2025-05-16 fairing anomaly). A second test flight was slated for early 2026. Block 2 (1,000 kg payload) and Eris Heavy (4,000 kg payload) variants are planned. | 91.7%as of [2]11/12 successes; Orb-3 (CRS-3) exploded at liftoff Oct 2014 |
| Total flights | 3as of [1] | 1as of [1] | 12as of [2]Final Antares flight was NG-19 (Aug 1, 2023). NG-20+ moved to Falcon 9 due to Antares RD-181 engine supply disruption (Russia sanctions). ↑ Best |
| Cost / kg LEO | ₹30–35 crore per launch (~$3.1M–$3.6M)as of [1]Total launch price, not a per-kg figure. ↓ Cheapest | — | — |
| Summary | ISRO's small-satellite launcher, designed for quick-turnaround dedicated smallsat missions. Full manufacturing, marketing and launch rights were transferred to Hindustan Aeronautics Limited in June 2025 under a technology-transfer agreement. | Australia's first domestically developed orbital launch vehicle attempt, using a hybrid-propellant first and second stage; the maiden flight failed 14 seconds after liftoff in July 2025. | Primary launch vehicle for Cygnus ISS cargo missions from 2013–2023. Its Ukrainian-built Zenit-derived first stage and Russian RD-181 engines became untenable after the 2022 invasion of Ukraine. Northrop switched NG-20 onward to Falcon 9 while Antares 330 (with Firefly Miranda engines) is in development. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.