Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | SSLV (Small Satellite Launch Vehicle) 🇮🇳 India Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-07-26Remove × | |
|---|---|---|
| Company | ISRO / Hindustan Aeronautics Limited | Space One |
| Country | 🇮🇳 India | 🇯🇵 Japan |
| Status | Active | In Development |
| Vehicle class | Small | Small |
| Propellant | Solid (HTPB, stages 1–3) / MMH-MON3 liquid (velocity trimming module) | Solid |
| Reusable | No | No |
| Stages | 4 | 4 |
| First flight | 2022 | 2024 |
| Payload to LEO | 500 kgas of [1]500 km altitude, 35–55° inclination. 300 kg to 500 km SSO. ↑ Best | — |
| Payload to GTO | — | — |
| Height | 34 mas of [1] ↑ Best | — |
| Liftoff mass | 120 tas of [1] ↑ Best | — |
| Success rate | 2/3 (67%)as of [1]First flight (Aug 2022) partial failure — satellites reached a lower-than-planned orbit. Second and third flights successful. ↑ Best | 0/3 — three consecutive failuresas of [1]2024-03-13: disintegrated shortly after liftoff. 2024-12-18: began tumbling during 1st-stage burn, flight terminated. 2026-03-04: flight termination activated ~70 seconds after liftoff. All three launches flew from Spaceport Kii, Wakayama — Japan's first private-sector spaceport. Program grounded as of this research; precise payload/height/mass specs not confirmed from a primary source. |
| Total flights | 3as of [1] ↑ Best | 3as of [1] ↑ Best |
| Cost / kg LEO | ₹30–35 crore per launch (~$3.1M–$3.6M)as of [1]Total launch price, not a per-kg figure. ↓ Cheapest | — |
| Summary | ISRO's small-satellite launcher, designed for quick-turnaround dedicated smallsat missions. Full manufacturing, marketing and launch rights were transferred to Hindustan Aeronautics Limited in June 2025 under a technology-transfer agreement. | A Japanese commercial solid-fuel small launcher that has failed on all three flight attempts through March 2026, putting its commercial viability in serious question. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.