Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | SpaceX | Firefly Aerospace | SpaceX |
| Country | 🇺🇸 USA | 🇺🇸 USA | 🇺🇸 USA |
| Status | In Development | Active | Active |
| Vehicle class | Super Heavy | Small | Medium |
| Propellant | CH₄ / LOX | RP-1 / LOX | RP-1 / LOX |
| Reusable | Yes | No | Yes |
| Stages | 2 | 2 | 2 |
| First flight | 2023 | 2021 | 2010 |
| Payload to LEO | ~150,000 kgas of [1]SpaceX projected max payload in fully expendable mode; ~100,000 kg reusable ↑ Best | 1,030 kgas of [1]SSO capacity ~630 kg | 22,800 kgas of [1]Reusable first stage (expended gives 22,800 kg; reused gives ~15,600 kg) |
| Payload to GTO | ~21,000 kgas of [1]Reusable configuration estimate ↑ Best | — | 8,300 kgas of [1]Expendable configuration. Reusable GTO capacity ~5,500 kg. |
| Height | 121 mas of [1]Version 2 (V2) full stack Ship + Super Heavy ↑ Best | 29 mas of [1] | 70 mas of [1] |
| Liftoff mass | ~5,000 tas of [1] ↑ Best | 54 tas of [1] | 549 tas of [1] |
| Success rate | ~55%as of [2]IFT-1 through IFT-11; ~6 complete mission successes, remainder partial or vehicle lost. No orbital payload deployment yet. | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 | 99.5%as of [2]634/637 full successes; Block 5 alone 580/581 = 99.8% ↑ Best |
| Total flights | 11as of [2]IFT-1 (Apr 2023) through IFT-11 (May 2026 target). IFT-10 (Aug 2025) achieved full mission: booster caught + Ship splash-down. | 7as of [2] | 637as of [2] ↑ Best |
| Cost / kg LEO | ~$600/kgas of [1]SpaceX target figure; not yet achieved in operational configuration ↓ Cheapest | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO | ~$2,720/kgas of [1]Based on $67M list price / 22,800 kg LEO (expendable) |
| Summary | Largest and most powerful rocket ever flown. Super Heavy booster uses 33 Raptor engines. V3 Ship introduced Aug 2025. Mechazilla caught the booster on IFT-5 (Oct 2024) and IFT-10 (Aug 2025). Primary vehicle for Artemis HLS lunar landing (Artemis III planned 2026). | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. | The world's most frequently flown orbital rocket. Block 5 first stages have landed over 280 times and reflown up to 23 times. Backbone of Starlink and commercial crewed launches. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.