Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | SpaceX | ISRO | Firefly Aerospace |
| Country | 🇺🇸 USA | 🇮🇳 India | 🇺🇸 USA |
| Status | In Development | Active | Active |
| Vehicle class | Super Heavy | Heavy | Small |
| Propellant | CH₄ / LOX | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | RP-1 / LOX |
| Reusable | Yes | No | No |
| Stages | 2 | 3 | 2 |
| First flight | 2023 | 2017 | 2021 |
| Payload to LEO | ~150,000 kgas of [1]SpaceX projected max payload in fully expendable mode; ~100,000 kg reusable ↑ Best | 10,000 kgas of [1] | 1,030 kgas of [1]SSO capacity ~630 kg |
| Payload to GTO | ~21,000 kgas of [1]Reusable configuration estimate ↑ Best | 4,000 kgas of [1] | — |
| Height | 121 mas of [1]Version 2 (V2) full stack Ship + Super Heavy ↑ Best | 43.43 mas of [1] | 29 mas of [1] |
| Liftoff mass | ~5,000 tas of [1] ↑ Best | 643 tas of [1] | 54 tas of [1] |
| Success rate | ~50%as of [2]Flights 1-12; ~6 complete mission successes (incl. Flights 10 and 11), remainder partial or vehicle lost. First payload deploy on Flight 10 (Aug 2025); Flight 12 (V3 debut) lost during descent. | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 |
| Total flights | 12as of [2]Flight 1 (Apr 2023) through Flight 12 (May 22, 2026 — V3 debut from Pad 2). Flight 11 (Oct 13, 2025) closed out Block 2. ↑ Best | 10as of [2] | 7as of [2] |
| Cost / kg LEO | ~$600/kgas of [1]SpaceX target figure; not yet achieved in operational configuration ↓ Cheapest | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO |
| Summary | Largest and most powerful rocket ever flown. Super Heavy booster uses 33 Raptor engines. V3 Ship debuted on Flight 12 (May 22, 2026) from Starbase Pad 2 — it reached space but broke up at the ocean surface, and the vehicle is grounded pending an FAA mishap review. Mechazilla booster catches demonstrated from Flight 5 (Oct 2024) onward; first payload deploy on Flight 10 (Aug 2025). Primary vehicle for the Artemis HLS lunar lander (Artemis III LEO docking demo 2027, first landing on Artemis IV). | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.