Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | SpaceX | ISRO | Orienspace |
| Country | 🇺🇸 USA | 🇮🇳 India | 🇨🇳 China |
| Status | In Development | Active | Active |
| Vehicle class | Super Heavy | Heavy | Medium |
| Propellant | CH₄ / LOX | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | Solid (HTPB) — three core stages + four strap-on boosters |
| Reusable | Yes | No | No |
| Stages | 2 | 3 | 3 |
| First flight | 2023 | 2017 | 2024 |
| Payload to LEO | ~150,000 kgas of [1]SpaceX projected max payload in fully expendable mode; ~100,000 kg reusable ↑ Best | 10,000 kgas of [1] | 6,500 kgas of [1]~4,200 kg to 500 km SSO |
| Payload to GTO | ~21,000 kgas of [1]Reusable configuration estimate ↑ Best | 4,000 kgas of [1] | — |
| Height | 121 mas of [1]Version 2 (V2) full stack Ship + Super Heavy ↑ Best | 43.43 mas of [1] | 30 mas of [1] |
| Liftoff mass | ~5,000 tas of [1] ↑ Best | 643 tas of [1] | ~400 tas of [1] |
| Success rate | ~50%as of [2]Flights 1-12; ~6 complete mission successes (incl. Flights 10 and 11), remainder partial or vehicle lost. First payload deploy on Flight 10 (Aug 2025); Flight 12 (V3 debut) lost during descent. | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | 100%as of [2]2/2 successes: maiden flight Jan 11, 2024; second flight Oct 2025 delivered 3 commercial satellites to SSO ↑ Best |
| Total flights | 12as of [2]Flight 1 (Apr 2023) through Flight 12 (May 22, 2026 — V3 debut from Pad 2). Flight 11 (Oct 13, 2025) closed out Block 2. ↑ Best | 10as of [2] | 2as of [2]Both flights launched from a barge in the Yellow Sea off Haiyang, Shandong |
| Cost / kg LEO | ~$600/kgas of [1]SpaceX target figure; not yet achieved in operational configuration ↓ Cheapest | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) | — |
| Summary | Largest and most powerful rocket ever flown. Super Heavy booster uses 33 Raptor engines. V3 Ship debuted on Flight 12 (May 22, 2026) from Starbase Pad 2 — it reached space but broke up at the ocean surface, and the vehicle is grounded pending an FAA mishap review. Mechazilla booster catches demonstrated from Flight 5 (Oct 2024) onward; first payload deploy on Flight 10 (Aug 2025). Primary vehicle for the Artemis HLS lunar lander (Artemis III LEO docking demo 2027, first landing on Artemis IV). | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | The world's most powerful solid-propellant launch vehicle and the largest rocket yet flown from a sea platform. Orienspace's barge-launched Gravity-1 gives Chinese commercial customers a mobile, weather-flexible ride for mid-inclination smallsat batches; both flights to date succeeded. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.