Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | SpaceX | Rocket Lab | PLD Space |
| Country | 🇺🇸 USA | 🇺🇸 USA | 🇪🇸 Spain |
| Status | In Development | In Development | In Development |
| Vehicle class | Super Heavy | Medium | Small |
| Propellant | CH₄ / LOX | CH₄ / LOX | RP-1 / LOX |
| Reusable | Yes | Yes | Yes |
| Stages | 2 | 2 | 2 |
| First flight | 2023 | 2026 | 2026 |
| Payload to LEO | ~150,000 kgas of [1]SpaceX projected max payload in fully expendable mode; ~100,000 kg reusable ↑ Best | 13,000 kgas of [1]Reusable configuration with downrange barge landing — this is the single payload figure Rocket Lab publishes. ~15,000 kg expendable. | 1,080 kgas of [1]540 kg to SSO. First flight is a stated plan (targeted Q1 2026 as of this research; not yet confirmed flown) — treat as a target, not a fact. |
| Payload to GTO | ~21,000 kgas of [1]Reusable configuration estimate ↑ Best | — | — |
| Height | 121 mas of [1]Version 2 (V2) full stack Ship + Super Heavy ↑ Best | 43 mas of [1] | 35.7 mas of [1] |
| Liftoff mass | ~5,000 tas of [1] ↑ Best | ~481 tas of [1] | 69 tas of [1] |
| Success rate | ~50%as of [2]Flights 1-12; ~6 complete mission successes (incl. Flights 10 and 11), remainder partial or vehicle lost. First payload deploy on Flight 10 (Aug 2025); Flight 12 (V3 debut) lost during descent. ↑ Best | — | — |
| Total flights | 12as of [2]Flight 1 (Apr 2023) through Flight 12 (May 22, 2026 — V3 debut from Pad 2). Flight 11 (Oct 13, 2025) closed out Block 2. ↑ Best | — | — |
| Cost / kg LEO | ~$600/kgas of [1]SpaceX target figure; not yet achieved in operational configuration ↓ Cheapest | — | — |
| Summary | Largest and most powerful rocket ever flown. Super Heavy booster uses 33 Raptor engines. V3 Ship debuted on Flight 12 (May 22, 2026) from Starbase Pad 2 — it reached space but broke up at the ocean surface, and the vehicle is grounded pending an FAA mishap review. Mechazilla booster catches demonstrated from Flight 5 (Oct 2024) onward; first payload deploy on Flight 10 (Aug 2025). Primary vehicle for the Artemis HLS lunar lander (Artemis III LEO docking demo 2027, first landing on Artemis IV). | Rocket Lab's medium-lift reusable rocket targeting the $100B constellation replenishment market. Uses a 'hungry hippo' fairings design that opens at the top rather than traditional clamshell separation. First flight delayed to Q4 2026 after a Jan 2026 propellant tank test anomaly. | PLD Space's orbital small launcher with a recoverable first stage (engine thrust + parachutes), developed with ESA Future Launchers Preparatory Programme support; primary launch site is the Guiana Space Centre. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.