Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | Avio / Arianespace | ISRO | Arianespace / ArianeGroup |
| Country | 🇪🇺 Europe | 🇮🇳 India | 🇪🇺 Europe |
| Status | Active | Active | Active |
| Vehicle class | Small | Heavy | Heavy |
| Propellant | Solid (HTPB + ammonium perchlorate all four stages) | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | LH₂ / LOX (Vulcain 2.1 + Vinci) |
| Reusable | No | No | No |
| Stages | 4 | 3 | 2 |
| First flight | 2022 | 2017 | 2024 |
| Payload to LEO | 2,300 kgas of [1]SSO: ~1,700 kg | 10,000 kgas of [1] | 21,650 kgas of [1]Ariane 62 (2 boosters) / Ariane 64 (4 boosters); 64 offers higher GTO capacity ↑ Best |
| Payload to GTO | — | 4,000 kgas of [1] | 11,500 kgas of [1]Ariane 64 configuration. Ariane 62 delivers ~4,500 kg to GTO. ↑ Best |
| Height | 35 mas of [1] | 43.43 mas of [1] | 56–63 mas of [1]56 m (Ariane 62) / 63 m (Ariane 64 with 4 solid boosters) ↑ Best |
| Liftoff mass | 210 tas of [1] | 643 tas of [1] | 530–860 tas of [1]530 t (A62) / 860 t (A64) ↑ Best |
| Success rate | 75%as of [2]6/8 successes; VV22 (Dec 2022) Zefiro-40 failure destroyed Pléiades Neo 5&6; returned to flight VV25 (Dec 2024). 3 successes in 2025. | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | 100%as of [2]7/7 missions through VA268 Amazon Leo (Apr 30, 2026); Ariane 64 debut Feb 12, 2026 ↑ Best |
| Total flights | 8as of [2] | 10as of [2] ↑ Best | 7as of [2] |
| Cost / kg LEO | ~$16,500/kgas of [1]Based on ~$38M list price / 2,300 kg | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest | ~$7,500/kgas of [1]Estimate based on ~$115M A62 / ~$165M A64 list prices |
| Summary | Europe's primary small satellite launcher derived from Vega. The P120C first-stage motor is shared with Ariane 6's solid strap-on boosters. Avio took over programme management from Arianespace in Dec 2025. | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | Europe's flagship launcher replacing Ariane 5. The Vinci re-ignitable upper stage enables multi-orbit missions and controlled deorbit. Primary customers: Amazon Kuiper, European government payloads, and ESA science missions. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.