Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Avio / Arianespace | CASC / CALT | NASA / Boeing |
| Country | 🇪🇺 Europe | 🇨🇳 China | 🇺🇸 USA |
| Status | Active | Active | Active |
| Vehicle class | Small | Heavy | Super Heavy |
| Propellant | Solid (HTPB + ammonium perchlorate all four stages) | LH₂ / LOX (YF-77 core) + RP-1/LOX (YF-100 boosters) | LH₂ / LOX (RS-25); solid HTPB (SRBs) |
| Reusable | No | No | No |
| Stages | 4 | 2 | 2 |
| First flight | 2022 | 2016 | 2022 |
| Payload to LEO | 2,300 kgas of [1]SSO: ~1,700 kg | 25,000 kgas of [1]CZ-5B variant (no upper stage) delivers 25,000 kg LEO for Tiangong station modules | 95,000 kgas of [1] ↑ Best |
| Payload to GTO | — | 14,000 kgas of [1]CZ-5 variant (with YF-75D upper stage) | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best |
| Height | 35 mas of [1] | 56.97 mas of [1] | 98.1 mas of [1] ↑ Best |
| Liftoff mass | 210 tas of [1] | 869 tas of [1] | 2,608 tas of [1] ↑ Best |
| Success rate | 75%as of [2]6/8 successes; VV22 (Dec 2022) Zefiro-40 failure destroyed Pléiades Neo 5&6; returned to flight VV25 (Dec 2024). 3 successes in 2025. | 94.1%as of [2]16/17 successes (10 CZ-5 + 7 CZ-5B). Failure: CZ-5 Y2 (Jul 2017, engine anomaly); loss of Shijian-18 satellite. | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) ↑ Best |
| Total flights | 8as of [2] | 17as of [2] ↑ Best | 2as of [2] |
| Cost / kg LEO | ~$16,500/kgas of [1]Based on ~$38M list price / 2,300 kg ↓ Cheapest | — | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost |
| Summary | Europe's primary small satellite launcher derived from Vega. The P120C first-stage motor is shared with Ariane 6's solid strap-on boosters. Avio took over programme management from Arianespace in Dec 2025. | China's most powerful operational rocket and the backbone of its flagship space programs. Launched Tianwen-1 to Mars, Chang'e 5 sample return, Chang'e 6 far-side sample return, all Tiangong core and lab modules, and the Xuntian space telescope. The CZ-5B variant delivers entire station modules in a single flight. | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.