Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Electron 🇳🇿 New Zealand / USA Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | ULA | Rocket Lab | JAXA / IHI Aerospace |
| Country | 🇺🇸 USA | 🇳🇿 New Zealand / USA | 🇯🇵 Japan |
| Status | Active | Active | Retired |
| Vehicle class | Heavy | Small | Small |
| Propellant | LNG / LOX (BE-4); LH₂ / LOX (Centaur V) | RP-1 / LOX | Solid (HTPB — all stages) |
| Reusable | No | Yes | No |
| Stages | 2 | 2 | 3 |
| First flight | 2024 | 2017 | 2013 – 2022 |
| Payload to LEO | 27,200 kgas of [1]VC2S configuration (2 solid strap-on boosters) ↑ Best | 300 kgas of [1]~200 kg reusable mode (lower due to propellant reserved for re-entry burn) | 590 kgas of [1]500 kg to SSO. Enhanced Epsilon (from E-4) added 700 kg LEO via PBS liquid kick stage. |
| Payload to GTO | 14,400 kgas of [1] ↑ Best | — | — |
| Height | 61.6 mas of [1] ↑ Best | 18 mas of [1] | 26 mas of [1] |
| Liftoff mass | 591 tas of [1]VC2S configuration ↑ Best | 13 tas of [1] | 96 tas of [1] |
| Success rate | 100%as of [2]4/4 mission successes: VC2 Cert-1 (Jan 2024), VC2 Cert-2 (Oct 2024), VC4 USSF-87 (Feb 2026), VC2 USSF-106 (Mar 2026) ↑ Best | 95.4%as of [2]83/87 orbital successes; 21/21 success rate in 2025 calendar year per Rocket Lab investor release | 83.3%as of [2]5/6 successes. E-6 (Oct 12, 2022) PBS upper stage failed to ignite, eight satellites lost. Epsilon S (next-generation) ground test anomaly Jan 2023 effectively ended the programme. |
| Total flights | 4as of [2] | 87as of [2] ↑ Best | 6as of [2] |
| Cost / kg LEO | ~$5,500/kgas of [1]Estimated; list pricing not public. Priced below Atlas V, above Ariane 6. ↓ Cheapest | ~$25,000/kgas of [1]Based on ~$7.5M list price / 300 kg payload | — |
| Summary | ULA's next-generation medium-heavy rocket replacing Atlas V. Powered by two BE-4 engines on the first stage and a cryogenic Centaur V upper stage. Primary customer is USSF under NSSL Phase 2. | The world's most commercially active small launch vehicle, designed and built in-house at Rocket Lab. Rutherford engines are the first flight-proven engines made with additive manufacturing (metal 3D printing). Booster recovery via parachute and helicopter catch (later transitioned to ocean recovery). | JAXA's small solid-fuel rocket derived from the M-V rocket heritage. Designed for highly autonomous operations — launch preparations could be managed by just 8 people. The sixth and final E-6 mission (Oct 2022) failed when the PBS kick stage didn't ignite; a ground explosion during Epsilon S testing (Jan 2023) ended the programme. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.