Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | ULA | ISRO | CASC / CALT |
| Country | 🇺🇸 USA | 🇮🇳 India | 🇨🇳 China |
| Status | Active | Active | Active |
| Vehicle class | Heavy | Heavy | Heavy |
| Propellant | LNG / LOX (BE-4); LH₂ / LOX (Centaur V) | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | UDMH/N₂O₄ (stages 1–2) + LH₂/LOX (stage 3 YF-75) |
| Reusable | No | No | No |
| Stages | 2 | 3 | 3 |
| First flight | 2024 | 2017 | 1996 |
| Payload to LEO | 27,200 kgas of [1]VC2S configuration (2 solid strap-on boosters) ↑ Best | 10,000 kgas of [1] | 11,200 kgas of [1] |
| Payload to GTO | 14,400 kgas of [1] ↑ Best | 4,000 kgas of [1] | 5,500 kgas of [1]With 4 strap-on liquid boosters (CZ-3B/E enhanced variant) |
| Height | 61.6 mas of [1] ↑ Best | 43.43 mas of [1] | 54.84 mas of [1] |
| Liftoff mass | 591 tas of [1]VC2S configuration | 643 tas of [1] ↑ Best | 426 tas of [1]Enhanced variant with 4 liquid strap-on boosters |
| Success rate | 100%as of [2]4/4 mission successes: VC2 Cert-1 (Jan 2024), VC2 Cert-2 (Oct 2024), VC4 USSF-87 (Feb 2026), VC2 USSF-106 (Mar 2026) ↑ Best | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | ~95%as of [2]~6 failures/partial failures out of ~105+ flights; gradually being superseded by Long March 5 for GTO |
| Total flights | 4as of [2] | 10as of [2] | ~105as of [2] ↑ Best |
| Cost / kg LEO | ~$5,500/kgas of [1]Estimated; list pricing not public. Priced below Atlas V, above Ariane 6. | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest | — |
| Summary | ULA's next-generation medium-heavy rocket replacing Atlas V. Powered by two BE-4 engines on the first stage and a cryogenic Centaur V upper stage. Primary customer is USSF under NSSL Phase 2. | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | China's primary geostationary transfer vehicle for over 25 years. Launched communications, meteorology, and navigation satellites including Beidou-3 (GEO/IGSO nodes). Being phased out in favour of Long March 5 for heavier GTO payloads as newer domestic communications satellites grow in mass. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.