Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | LandSpace | Galactic Energy | Rocket Lab |
| Country | 🇨🇳 China | 🇨🇳 China | 🇺🇸 USA |
| Status | Active | Active | In Development |
| Vehicle class | Medium | Small | Medium |
| Propellant | CH₄ / LOX (9× TQ-12B first stage; TQ-15B vacuum upper stage) | Solid (stages 1–3) + hydrazine liquid upper stage | CH₄ / LOX |
| Reusable | Yes | No | Yes |
| Stages | 2 | 4 | 2 |
| First flight | 2025 | 2020 | 2026 |
| Payload to LEO | 21,000 kgas of [1]Expendable; ~18,300 kg with first-stage recovery ↑ Best | 400 kgas of [1]300 kg to SSO. | 13,000 kgas of [1]Reusable configuration with downrange barge landing — this is the single payload figure Rocket Lab publishes. ~15,000 kg expendable. |
| Payload to GTO | — | — | — |
| Height | 76.2 mas of [1] ↑ Best | 20 mas of [1] | 43 mas of [1] |
| Liftoff mass | ~660 tas of [1] ↑ Best | 33 tas of [1] | ~481 tas of [1] |
| Success rate | 100%as of [2]1/1 orbital successes (Y1, Dec 3, 2025). First-stage recovery failed — abnormal combustion during the landing burn crashed the booster near the landing zone. ↑ Best | 91.3% (21/23)as of [1] | — |
| Total flights | 1as of [3]Second orbital launch and recovery attempt targeted Q2 2026 per LandSpace | 23as of [1] ↑ Best | — |
| Cost / kg LEO | — | ~$4.5M per launchas of [1]Total launch price, not a per-kg figure. ↓ Cheapest | — |
| Summary | LandSpace's stainless-steel, reusable methalox rocket — China's closest analogue to Falcon 9. The Y1 debut (Dec 3, 2025) reached orbit on the first attempt but lost the booster during its landing attempt; a second flight with another recovery attempt is targeted for Q2 2026. | Galactic Energy's workhorse small-lift solid rocket — one of the most-flown Chinese commercial launchers — with a sea-launch variant (Ceres-1S, debuted Sep 2023) and a larger Ceres-2 in development. | Rocket Lab's medium-lift reusable rocket targeting the $100B constellation replenishment market. Uses a 'hungry hippo' fairings design that opens at the top rather than traditional clamshell separation. First flight delayed to Q4 2026 after a Jan 2026 propellant tank test anomaly. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.