Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | LandSpace | ISRO | Firefly Aerospace |
| Country | 🇨🇳 China | 🇮🇳 India | 🇺🇸 USA |
| Status | Active | Active | Active |
| Vehicle class | Medium | Medium | Small |
| Propellant | CH₄ / LOX (9× TQ-12B first stage; TQ-15B vacuum upper stage) | Solid (PS1/PS3) + UDMH/N₂O₄ (PS2/PS4) — 4 alternating stages | RP-1 / LOX |
| Reusable | Yes | No | No |
| Stages | 2 | 4 | 2 |
| First flight | 2025 | 1993 | 2021 |
| Payload to LEO | 21,000 kgas of [1]Expendable; ~18,300 kg with first-stage recovery ↑ Best | 3,800 kgas of [1]PSLV-XL with 6 extended solid strap-ons. Standard PSLV-G: 3,250 kg LEO. SSO: ~1,750 kg | 1,030 kgas of [1]SSO capacity ~630 kg |
| Payload to GTO | — | — | — |
| Height | 76.2 mas of [1] ↑ Best | 44 mas of [1] | 29 mas of [1] |
| Liftoff mass | ~660 tas of [1] ↑ Best | 320 tas of [1]PSLV-XL configuration | 54 tas of [1] |
| Success rate | 100%as of [2]1/1 orbital successes (Y1, Dec 3, 2025). First-stage recovery failed — abnormal combustion during the landing burn crashed the booster near the landing zone. ↑ Best | 93.7%as of [2]60/64 mission successes. Two consecutive recent failures: C61 (2024) and C62 (Jan 12, 2026, stage-3 anomaly, 16 satellites lost). | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 |
| Total flights | 1as of [3]Second orbital launch and recovery attempt targeted Q2 2026 per LandSpace | 64as of [2] ↑ Best | 7as of [2] |
| Cost / kg LEO | — | ~$4,000/kgas of [1]Estimated from commercial launch contracts ↓ Cheapest | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO |
| Summary | LandSpace's stainless-steel, reusable methalox rocket — China's closest analogue to Falcon 9. The Y1 debut (Dec 3, 2025) reached orbit on the first attempt but lost the booster during its landing attempt; a second flight with another recovery attempt is targeted for Q2 2026. | India's most reliable and frequently flown launch vehicle, operational since 1994. Set a world record in Feb 2017 by deploying 104 satellites in a single flight (Cartosat-2D + 103 microsats). Launched Chandrayaan-1 (2008), Mars Orbiter Mission (2013), and Aditya-L1 (2023). The dual C61/C62 failure streak raised concerns about aging solid motor design. The vehicle is on a return-to-flight campaign (not retired): PSLV-C63 (TDS-01 technology demonstrator), with strengthened third-stage/PS3 checks following the expert-committee (FAC) review, is targeted for late June / early July 2026. | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.