Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Electron 🇳🇿 New Zealand / USA Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-28Remove × | ||
|---|---|---|---|
| Company | LandSpace | NASA / Boeing | Rocket Lab |
| Country | 🇨🇳 China | 🇺🇸 USA | 🇳🇿 New Zealand / USA |
| Status | Active | Active | Active |
| Vehicle class | Medium | Super Heavy | Small |
| Propellant | CH₄ / LOX (9× TQ-12B first stage; TQ-15B vacuum upper stage) | LH₂ / LOX (RS-25); solid HTPB (SRBs) | RP-1 / LOX |
| Reusable | Yes | No | Yes |
| Stages | 2 | 2 | 2 |
| First flight | 2025 | 2022 | 2017 |
| Payload to LEO | 21,000 kgas of [1]Expendable; ~18,300 kg with first-stage recovery | 95,000 kgas of [1] ↑ Best | 300 kgas of [1]~200 kg reusable mode (lower due to propellant reserved for re-entry burn) |
| Payload to GTO | — | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best | — |
| Height | 76.2 mas of [1] | 98.1 mas of [1] ↑ Best | 18 mas of [1] |
| Liftoff mass | ~660 tas of [1] | 2,608 tas of [1] ↑ Best | 13 tas of [1] |
| Success rate | 100%as of [2]1/1 orbital successes (Y1, Dec 3, 2025). First-stage recovery failed — abnormal combustion during the landing burn crashed the booster near the landing zone. ↑ Best | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) ↑ Best | 95.6%as of [3]87 successes / 91 Electron-family flights. Orbital Electron alone: 78/82 (95.1%). HASTE: 9/9. On a 50-flight success streak since December 2023; 21/21 in the 2025 calendar year. |
| Total flights | 1as of [3]Second orbital launch and recovery attempt targeted Q2 2026 per LandSpace | 2as of [2] | 91as of [3]91 Electron-family flights: 82 orbital plus 9 suborbital HASTE. Reconciled against three 10-K cumulative checkpoints (38/54/75 successes through 2023/2024/2025). Rocket Lab counts HASTE inside its own 'Electron launched N times' figure. ↑ Best |
| Cost / kg LEO | — | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost | ~$25,000/kgas of [1]Based on ~$7.5M list price / 300 kg payload ↓ Cheapest |
| Summary | LandSpace's stainless-steel, reusable methalox rocket — China's closest analogue to Falcon 9. The Y1 debut (Dec 3, 2025) reached orbit on the first attempt but lost the booster during its landing attempt; a second flight with another recovery attempt is targeted for Q2 2026. | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. | The world's most commercially active small launch vehicle, designed and built in-house at Rocket Lab. Rutherford engines are the first flight-proven engines made with additive manufacturing (metal 3D printing). Booster recovery via parachute and helicopter catch (later transitioned to ocean recovery). |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.