Pick up to 4 vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it. No JavaScript required.
| Attribute | ||
|---|---|---|
| Operator | Blue Origin | Intuitive Machines |
| Prime contractor | Blue Origin (with Lockheed Martin, Boeing, Draper, Astrobotic, Honeybee Robotics on prime team) | Intuitive Machines |
| Status | In development | Landed |
| Customer | NASA-HLS | NASA-CLPS |
| Launch date | 2030 (NET — Artemis V crewed); uncrewed demo 2027 | 2025-02-27 |
| Landing date | — | 2025-03-06 |
| Landing site | Lunar south pole — 30-day surface stays | Mons Mouton plateau, lunar south pole (~400 m off target) |
| Payload | 20 t reusable / 30 t one-way to surface; crew 2-4 for up to 30 days (2026-01-04) | 10 payloads delivered (2025-03-06) |
| Contract value | $3.4B (2023-05-19) | $62.5M (2025-02-27) |
| Outcome | Selected May 2023 as second HLS provider for sustained Artemis-era lunar operations. Full-scale prototype delivered to NASA Johnson Space Center in early 2026 for astronaut training. Completed third pressurized suit-test campaign with NASA Johnson's Active Response Gravity Offload System (ARGOS). | Soft-landed but tipped onto its side after altimeter failure caused the lander to strike a plateau and skid into a crater rim. Power depleted within ~24 hours; ~250 MB of data transmitted including TRIDENT drill range-of-motion demonstration. |
Pure URL state — no JavaScript, no localStorage, no cookies. The comparison renders entirely on the server from the slugs in the query string. Bookmark or share the URL and the comparison reproduces exactly.
Underlying dataset: GET /api/moon/landers. Methodology: /moon/methodology.