Pick up to 4 vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it. No JavaScript required.
| Attribute | |||
|---|---|---|---|
| Operator | ISRO | Intuitive Machines | Astrobotic |
| Prime contractor | ISRO | Intuitive Machines | Astrobotic |
| Status | Landed | Landed | Lost |
| Customer | ISRO | NASA-CLPS | NASA-CLPS |
| Launch date | 2023-07-14 | 2025-02-27 | 2024-01-08 |
| Landing date | 2023-08-23 | 2025-03-06 | — |
| Landing site | Statio Shiv Shakti, 69.37°S — first soft landing near lunar south pole | Mons Mouton plateau, lunar south pole (~400 m off target) | Sinus Viscositatis (planned; never reached) |
| Payload | Pragyan rover 27 kg + lander Vikram 1,749 kg (2023-08-23) | 10 payloads delivered (2025-03-06) | 20 payloads from 7 nations (2024-01-08) |
| Contract value | ₹6.15B (~$75M USD) (2023-07-14) | $62.5M (2025-02-27) | $108M (2024-01-08) |
| Outcome | First soft landing near the lunar south pole and first lunar landing by ISRO. Pragyan rover traversed ~100 m over 10 lunar days, confirmed sulfur, aluminium, calcium, iron, chromium, titanium, manganese, silicon, oxygen at the landing site. Lander 'hopped' to a secondary location demonstrating reusable propulsion. | Soft-landed but tipped onto its side after altimeter failure caused the lander to strike a plateau and skid into a crater rim. Power depleted within ~24 hours; ~250 MB of data transmitted including TRIDENT drill range-of-motion demonstration. | Maiden flight of ULA's Vulcan Centaur. Helium pressurant valve failed to reseal post-actuation, over-pressurizing the oxidizer tank and rupturing it. Lander commanded into controlled re-entry; burned up over South Pacific 2024-01-18. |
Pure URL state — no JavaScript, no localStorage, no cookies. The comparison renders entirely on the server from the slugs in the query string. Bookmark or share the URL and the comparison reproduces exactly.
Underlying dataset: GET /api/moon/landers. Methodology: /moon/methodology.