Pick up to 4 vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it. No JavaScript required.
| Attribute | HAKUTO-R Series 2 Resilience (SMBC × HAKUTO-R Venture Moon) Trust: Agency-primary Last verified Remove × | |
|---|---|---|
| Operator | ispace | Intuitive Machines |
| Prime contractor | ispace | Intuitive Machines |
| Status | Lost | In development |
| Customer | private | NASA-CLPS |
| Launch date | 2025-01-15 | 2026-Q4 (NET) |
| Landing date | 2025-06-05 | — |
| Landing site | Mare Frigoris (center; hard landing) | Reiner Gamma lunar swirl, Oceanus Procellarum |
| Payload | Tenacious micro-rover (5 kg, ispace EU) + 5 commercial payloads (2025-06-05) | 4 NASA payloads + rover + data-relay satellite + secondary payloads (2026-05-28) |
| Contract value | — | — |
| Outcome | Laser Range Finder anomaly during descent caused hard landing; data lost ~90 seconds before scheduled touchdown at 19:17 UTC. NASA's LRO imaged impact dark-smudge on 2025-06-11. ispace's 2025-06-24 technical analysis ruled out propulsion/power; isolated cause to LRF. | Targeted to be the first surface mission to land inside a lunar magnetic anomaly (swirl). Manifest includes three NASA-CADRE shoebox rovers, an ESA actuated laser retroreflector, and the Australian ALEPH-1 plant-growth payload. |
Pure URL state — no JavaScript, no localStorage, no cookies. The comparison renders entirely on the server from the slugs in the query string. Bookmark or share the URL and the comparison reproduces exactly.
Underlying dataset: GET /api/moon/landers. Methodology: /moon/methodology.