Pick up to 4 vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it. No JavaScript required.
| Attribute | |||
|---|---|---|---|
| Operator | Intuitive Machines | Intuitive Machines | CNSA |
| Prime contractor | Intuitive Machines | Intuitive Machines | China Academy of Space Technology (CAST) |
| Status | Landed | Landed | In development |
| Customer | NASA-CLPS | NASA-CLPS | CNSA |
| Launch date | 2025-02-27 | 2024-02-15 | 2026-08 (NET) |
| Landing date | 2025-03-06 | 2024-02-22 | — |
| Landing site | Mons Mouton plateau, lunar south pole (~400 m off target) | Malapert A crater, ~300 km from lunar south pole | Shackleton crater illuminated rim, lunar south pole |
| Payload | 10 payloads delivered (2025-03-06) | ~100 kg payload capacity (1,908 kg launch mass) (2024-02-22) | 18 science payloads across orbiter, lander, rover, mini-hopper, and Queqiao-2 (2026-05-28) |
| Contract value | $62.5M (2025-02-27) | $118M (2024-02-15) | — |
| Outcome | Soft-landed but tipped onto its side after altimeter failure caused the lander to strike a plateau and skid into a crater rim. Power depleted within ~24 hours; ~250 MB of data transmitted including TRIDENT drill range-of-motion demonstration. | First US Moon landing since Apollo 17 and first commercial soft landing in history. Lander tipped to ~30° on touchdown after landing-leg failure but transmitted data for ~7 days before sunset. | China's first dedicated lunar south-pole prospecting mission. Mini-flying probe hops into permanently shadowed regions to sample for water-ice volatiles. Italian laser retroreflector aboard the lander. |
Pure URL state — no JavaScript, no localStorage, no cookies. The comparison renders entirely on the server from the slugs in the query string. Bookmark or share the URL and the comparison reproduces exactly.
Underlying dataset: GET /api/moon/landers. Methodology: /moon/methodology.