Westinghouse
Westinghouse Electric Company
Overview
Major commercial nuclear reactor provider (AP1000 large reactors + eVinci microreactors). Won one of three NASA/DOE Fission Surface Power Phase 1 contracts in June 2022 to develop a 40 kW lunar surface reactor. Acquired from Toshiba in 2018 by Brookfield Asset Management; partial ownership transferred to Cameco Corp in 2023.
Moat: Patent portfolio + manufacturing capability across the commercial nuclear stack. eVinci microreactor design is one of the few US-developed micro-reactor concepts with both terrestrial deployment plans (Idaho National Lab demonstration 2026) and space-adapted variants.
Business
Primary customers
- Government: NASA / DOE (Fission Surface Power)
- Commercial: Commercial nuclear power utilities globally
- Defense: US Navy (naval nuclear heritage)
Sectors
Commercial nuclear reactors · Space microreactors · Naval nuclear · Decommissioning
Gallery



Key Products
- Fission Surface Power Phase 1 designdevelopment
40 kW class lunar surface reactor concept under the $5M NASA/DOE Phase 1 contract. Targets early-2030s lunar surface deployment.
- eVinci microreactordevelopment
Terrestrial microreactor (5 MW thermal class). Provides the technology heritage for the space-adapted lunar variant.
- AP1000 large pressurized water reactoroperational
Commercial nuclear reactor sold globally — flagship terrestrial product.
Investor Resources
Primary-source documents — straight from Westinghouse Electric Company's investor relations and SEC filings.
Near-term Catalysts
- 2025-2026
NASA Fission Surface Power Phase 2 solicitation
Down-select from 3 Phase 1 teams to a Phase 2 prime — winner gets the actual surface reactor demonstration.
- 2026
eVinci first criticality at Idaho National Lab
Validates the underlying microreactor technology before space adaptation.
Top Risks
- FSP Phase 2 down-select could favor IX (Intuitive Machines + X-Energy) or Lockheed Martin teams.
- Reactor delivery for surface use is fundamentally constrained by Artemis crew cadence (early 2030s at earliest).
- Westinghouse is privately held; investor access is indirect through Cameco (NYSE: CCJ) or Brookfield Asset Management (NYSE: BAM).
Recent Milestones
- 2022-06-21
Awarded $5M NASA/DOE Fission Surface Power Phase 1 contract
- 2024
NASA extends Phase 1 contracts to gather more information before Phase 2 solicitation
From Management
Recent interviews and talks from Westinghouse Electric Company's leadership — hear the strategy in their own words.
What investors should know
Q1How can investors get exposure to Westinghouse?⌄
Q2What's the Fission Surface Power timeline?⌄
Q3How does Westinghouse compare with IX and Lockheed Martin on the FSP bid?⌄
Q4Why does the Moon need nuclear power?⌄
Q5Is this related to Westinghouse's brand-name appliances?⌄
Peers
Compare side-by-side →Sources & References
Agency Document
- NASA — Fission Surface Power Project · 2022-06-21
Investor Relations
- Westinghouse — NASA/DOE space microreactor contract · 2022-06-21
Trade Press
- Nuclear Engineering International — Westinghouse FSP · 2022-06-21